The SPS at CERN currently uses a beam dumping system that is installed in the long straight section 1 (LSS1) of the SPS. This system consists of two beam stopper blocks for low and high energy beams, as well as two vertical and three horizontal kicker magnets, which deflect and dilute the beam on the dumps. Within the frame of the LHC injector upgrade project (LIU) the beam dumping system will be relocated to long straight section 5 (LSS5) and upgraded with an additional vertical kicker, new main switches and a single new beam dump, which covers the full energy range. The impact of a possible increase of the vertical kicker rise time on the beam has been studied in simulations with MAD-X for the different optics in the SPS. Furthermore, the...
As part of the LHC Injectors Upgrade project for LHC heavy ions, the SPS injection kicker system ris...
Mechanical internal dumps are used at the Proton Synchrotron (PS) to dispose of the circulating beam...
During Long Shutdown 2 (LS2, 2019-2021) all the injectors of the CERN LHC will undergo several upgra...
The CERN Super Proton Synchrotron (SPS) presently uses an internal beam dump system with two separat...
An internal beam dumping system is needed for the SPS, in order to prevent uncontrolled loss of the ...
The future CERN Super Proton Synchrotron (SPS) internal dump (Target Internal Dump Vertical Graphite...
For the LHC Injectors Upgrade (LIU) at CERN, the two Proton Synchrotron (PS) internal dumps are rede...
The Super Proton Synchrotron (SPS) is the last accelerator in the LHC Injectors Chain. Its performan...
The Super Proton Synchrotron (SPS) beam dump system is a concern for the planned High Luminosity LHC...
Abstract The Super Proton Synchrotron (SPS) beam dump system is a concern for the planned High Lumin...
The SPS accelerator will be used as injector for the LHC [1] and has to be adapted to the LHC requir...
The LHC Beam Dump System (LBDS) is designed to safely dispose the circulating beams over a wide rang...
The LHC Beam Dump System (LBDS) is designed to safely dispose the circulating beams over a wide rang...
The injection and beam dumping systems of the LHC will need to be upgraded to comply with the requir...
The SPS internal beam dump has been designed for beam specifications well below the HL-LHC ones, and...
As part of the LHC Injectors Upgrade project for LHC heavy ions, the SPS injection kicker system ris...
Mechanical internal dumps are used at the Proton Synchrotron (PS) to dispose of the circulating beam...
During Long Shutdown 2 (LS2, 2019-2021) all the injectors of the CERN LHC will undergo several upgra...
The CERN Super Proton Synchrotron (SPS) presently uses an internal beam dump system with two separat...
An internal beam dumping system is needed for the SPS, in order to prevent uncontrolled loss of the ...
The future CERN Super Proton Synchrotron (SPS) internal dump (Target Internal Dump Vertical Graphite...
For the LHC Injectors Upgrade (LIU) at CERN, the two Proton Synchrotron (PS) internal dumps are rede...
The Super Proton Synchrotron (SPS) is the last accelerator in the LHC Injectors Chain. Its performan...
The Super Proton Synchrotron (SPS) beam dump system is a concern for the planned High Luminosity LHC...
Abstract The Super Proton Synchrotron (SPS) beam dump system is a concern for the planned High Lumin...
The SPS accelerator will be used as injector for the LHC [1] and has to be adapted to the LHC requir...
The LHC Beam Dump System (LBDS) is designed to safely dispose the circulating beams over a wide rang...
The LHC Beam Dump System (LBDS) is designed to safely dispose the circulating beams over a wide rang...
The injection and beam dumping systems of the LHC will need to be upgraded to comply with the requir...
The SPS internal beam dump has been designed for beam specifications well below the HL-LHC ones, and...
As part of the LHC Injectors Upgrade project for LHC heavy ions, the SPS injection kicker system ris...
Mechanical internal dumps are used at the Proton Synchrotron (PS) to dispose of the circulating beam...
During Long Shutdown 2 (LS2, 2019-2021) all the injectors of the CERN LHC will undergo several upgra...