In this study, we considered a bi-objective, multi-project, multi-mode, resource-constrained project-scheduling problem. We adopted different objectives pairs, combinations of time-based and financial performance measures. As a solution method, we used the non-dominated sorting genetic algorithm II (NSGA-II). To improve NSGA-II, a backward–forward pass (BFP) procedure was proposed for new population generation as well as for post-processing. Different alternatives for implementing BFP were tested with the results reported for different objective function combinations. To increase diversity, an injection procedure was introduced and implemented. Both the BFP and injection procedures led to improved objective function values. Moreover, the in...
The resource constraint project scheduling problem (RCPSP) has attracted growing attention since the...
A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization prob...
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resour...
Here we consider a bi-objective, multi-project, multi-mode, resource-constrained project-scheduling ...
In this study, we considered a bi-objective, multi-project, multi-mode resource-constrained project ...
Despite the fact that companies manage multiple projects simultaneously, most research on resource-c...
In a multi-project environment, many projects are to be completed that rely on a common pool of scar...
A project scheduling problem investigates a set of activities that have to be scheduled due to prece...
A construction project is a group of discernible tasks or activities that are conduct-ed in a coordi...
In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode ...
Abstract. The resource-constrained project scheduling problem (RCPSP) is one of the most challenging...
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling p...
Project scheduling models with resource constraints and multi-mode activities aims to create a sched...
The resource-constrained project scheduling problem (RCPSP) is one of the most challenging problems ...
Purpose: The issue resource over-allocating is a big concern for project engineers in the process o...
The resource constraint project scheduling problem (RCPSP) has attracted growing attention since the...
A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization prob...
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resour...
Here we consider a bi-objective, multi-project, multi-mode, resource-constrained project-scheduling ...
In this study, we considered a bi-objective, multi-project, multi-mode resource-constrained project ...
Despite the fact that companies manage multiple projects simultaneously, most research on resource-c...
In a multi-project environment, many projects are to be completed that rely on a common pool of scar...
A project scheduling problem investigates a set of activities that have to be scheduled due to prece...
A construction project is a group of discernible tasks or activities that are conduct-ed in a coordi...
In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode ...
Abstract. The resource-constrained project scheduling problem (RCPSP) is one of the most challenging...
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling p...
Project scheduling models with resource constraints and multi-mode activities aims to create a sched...
The resource-constrained project scheduling problem (RCPSP) is one of the most challenging problems ...
Purpose: The issue resource over-allocating is a big concern for project engineers in the process o...
The resource constraint project scheduling problem (RCPSP) has attracted growing attention since the...
A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization prob...
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resour...