This paper reports part of the work of a MSc research study submitted to the University of Witwatersrand, Johannesburg, South Africa.Shovel-truck systems for loading and hauling material in open pit mines are now routinely analysed using simulation models or off-the-shelf simulation software packages, which can be very expensive for once-off or occasional use. The simulation models invariably produce different estimations of fleet sizes due to their differing estimations of cycle time. No single model or package can accurately estimate the required fleet size because the fleet operating parameters are characteristically random and dynamic. In order to improve confidence in sizing the fleet for a mining project, at least two estimation model...
This thesis investigates the effects of equipment size selection on the economics of open pit minin...
Computer modeling and discrete event simulation of industrial processes have gained a prominent role...
Methods for estimating productivity and costs, and dependent equipment selection process, have neede...
Historically considerable work has been done to develop models that simulate truck haulage for both ...
This thesis is aimed at studying the open pit truck- shovel haulage systems using computer simulatio...
Material handling in open pit mining accounts for about 50% of production costs. The selection and d...
In this paper, three mining operations are modeled using Visual SLAM with AweSim software. These ope...
A truck-shovel mining system is a flexible mining method commonly used in surface mines. Both simula...
In mining uncertainties related to equipment and operation are major reasons for loss of production....
In the mining industry, it is observed that sudden break-down of any equipment may stop the entire s...
The steady state production is mainly depends on availability of the different production machinerie...
Truck haulage is the most common means used for moving ore/waste in open-pit mining operations, but ...
A research report submitted to the Faculty of Engineering and Built Environment, University of Witw...
The impact of production optimization and scheduling mainly depends on availability of the machineri...
The technique introduced in this paper is based on logical simulation and functional complex models,...
This thesis investigates the effects of equipment size selection on the economics of open pit minin...
Computer modeling and discrete event simulation of industrial processes have gained a prominent role...
Methods for estimating productivity and costs, and dependent equipment selection process, have neede...
Historically considerable work has been done to develop models that simulate truck haulage for both ...
This thesis is aimed at studying the open pit truck- shovel haulage systems using computer simulatio...
Material handling in open pit mining accounts for about 50% of production costs. The selection and d...
In this paper, three mining operations are modeled using Visual SLAM with AweSim software. These ope...
A truck-shovel mining system is a flexible mining method commonly used in surface mines. Both simula...
In mining uncertainties related to equipment and operation are major reasons for loss of production....
In the mining industry, it is observed that sudden break-down of any equipment may stop the entire s...
The steady state production is mainly depends on availability of the different production machinerie...
Truck haulage is the most common means used for moving ore/waste in open-pit mining operations, but ...
A research report submitted to the Faculty of Engineering and Built Environment, University of Witw...
The impact of production optimization and scheduling mainly depends on availability of the machineri...
The technique introduced in this paper is based on logical simulation and functional complex models,...
This thesis investigates the effects of equipment size selection on the economics of open pit minin...
Computer modeling and discrete event simulation of industrial processes have gained a prominent role...
Methods for estimating productivity and costs, and dependent equipment selection process, have neede...