The bachelor thesis is aimed at the construction and technological solution of the rough top structure of the storage hall in Hradec Králové. Bachelor thesis contains technological background for the execution of rough construction. This work aims to solve problems with the procedures for the implementation of masonry and prefabricated structures. I focused on the part of the hall that will serve for administration and I devised the implementation procedure and the time consuming. As the project documentation did not have anything to do with the ceiling 1.NP, I had to solve the project site first and then I did the implementation technology. I also compared the two lifting devices in terms of economic and time requirements. Another objectiv...
The objective of this bachelor thesis is the design and description of the technological stage of th...
This diploma thesis is focused on construction technology solution of the construction of an apartme...
The bachelor thesis deal with technological steps od rough upper construction of a production hall t...
This diploma thesis deals with construction-technological project of production and storage hall in ...
The aim of this bachelor thesis is the design and description of the technologically selected stage ...
Writing of this bachelor thesis was stimulated by the construction of a new production hall in my ho...
The topic of the diploma thesis is a solution of the construction and a technological project of a p...
The bachelor thesis deals with the implementation of the gross overhead construction of the Jemnice ...
The subject of the bachelor's thesis is the design and assessment of the steel load-bearing structur...
This bachelor’s thesis deals with the solution of technology of ceiling construction and prefabricat...
The focus of this thesis is on the description of realization of rough upper construc-tion of wareho...
The main goal of my bachelor's thesis is the construction-technological solution of the rough supers...
This diploma thesis deals with the construction and technological project of the extension of the pr...
The subject of my diploma thesis is the design of realization of the Elit storage hall in Brno based...
The aim of the bachelor thesis is the construction and technological solution of the rough top struc...
The objective of this bachelor thesis is the design and description of the technological stage of th...
This diploma thesis is focused on construction technology solution of the construction of an apartme...
The bachelor thesis deal with technological steps od rough upper construction of a production hall t...
This diploma thesis deals with construction-technological project of production and storage hall in ...
The aim of this bachelor thesis is the design and description of the technologically selected stage ...
Writing of this bachelor thesis was stimulated by the construction of a new production hall in my ho...
The topic of the diploma thesis is a solution of the construction and a technological project of a p...
The bachelor thesis deals with the implementation of the gross overhead construction of the Jemnice ...
The subject of the bachelor's thesis is the design and assessment of the steel load-bearing structur...
This bachelor’s thesis deals with the solution of technology of ceiling construction and prefabricat...
The focus of this thesis is on the description of realization of rough upper construc-tion of wareho...
The main goal of my bachelor's thesis is the construction-technological solution of the rough supers...
This diploma thesis deals with the construction and technological project of the extension of the pr...
The subject of my diploma thesis is the design of realization of the Elit storage hall in Brno based...
The aim of the bachelor thesis is the construction and technological solution of the rough top struc...
The objective of this bachelor thesis is the design and description of the technological stage of th...
This diploma thesis is focused on construction technology solution of the construction of an apartme...
The bachelor thesis deal with technological steps od rough upper construction of a production hall t...