Case Study• In an LNG production plant, multiple propane (PR) refrigeration compressor failures since commissioning led to re-wheeling • PR refrigeration system was not considered to be the main bottleneck, nevertheless improved production rates were realized • Full refrigeration system machinery evaluation highlighted the main uplift to be a result of improvement in the Mixed Refrigerant (MR) system • Thermodynamic coupling of upgraded PR loop with MR loop resulted in added capacity to MR loo
Big process industries like PREEM AB, Sweden refining 16 million tonnes of crude oil annually are in...
LectureThe new generation of LNG plant are moving toward a larger size, that mean larger compression...
LecturePg. 105-120Major uprates of process compressor train performance can be achieved utilizing th...
Case Study• In an LNG production plant, multiple propane (PR) refrigeration compressor failures sin...
LectureIncreasing demand for LNG has driven the requirement for a significant increase in LNG plant...
LectureRasGas LNG Trains-1 and 2, comprising of three refrigeration centrifugal compressors each, w...
AbstractIn this paper, an LNG BOG re-liquefaction system operating according to the Claude refrigera...
As a result of the growth of LNG markets, the LNG production capacity of liquefaction trains is incr...
Abstract Refrigeration turbo compressors in modern LNG liquefaction plants are traditionally driven ...
Case Study•Process Overview •Hydrogen Recycle Compressor •The Problem •Performance Trends •Compr...
Lecturepg. 1-18A Root Cause Failure Analysis (RCFA) for repeated impeller blade failures in a five s...
TutorialThe International Liquefied Natural Gas (LNG) trade is expanding rapidly. Projects are bein...
This study aims to improve the performance of the propane precooling cycle used for precooling of bo...
LectureChevron Australia, as part of the Wheatstone Project, constructed a two train liquefied natur...
Tutorialpg. 115-148The international liquefied natural gas (LNG) trade is expanding rapidly. Project...
Big process industries like PREEM AB, Sweden refining 16 million tonnes of crude oil annually are in...
LectureThe new generation of LNG plant are moving toward a larger size, that mean larger compression...
LecturePg. 105-120Major uprates of process compressor train performance can be achieved utilizing th...
Case Study• In an LNG production plant, multiple propane (PR) refrigeration compressor failures sin...
LectureIncreasing demand for LNG has driven the requirement for a significant increase in LNG plant...
LectureRasGas LNG Trains-1 and 2, comprising of three refrigeration centrifugal compressors each, w...
AbstractIn this paper, an LNG BOG re-liquefaction system operating according to the Claude refrigera...
As a result of the growth of LNG markets, the LNG production capacity of liquefaction trains is incr...
Abstract Refrigeration turbo compressors in modern LNG liquefaction plants are traditionally driven ...
Case Study•Process Overview •Hydrogen Recycle Compressor •The Problem •Performance Trends •Compr...
Lecturepg. 1-18A Root Cause Failure Analysis (RCFA) for repeated impeller blade failures in a five s...
TutorialThe International Liquefied Natural Gas (LNG) trade is expanding rapidly. Projects are bein...
This study aims to improve the performance of the propane precooling cycle used for precooling of bo...
LectureChevron Australia, as part of the Wheatstone Project, constructed a two train liquefied natur...
Tutorialpg. 115-148The international liquefied natural gas (LNG) trade is expanding rapidly. Project...
Big process industries like PREEM AB, Sweden refining 16 million tonnes of crude oil annually are in...
LectureThe new generation of LNG plant are moving toward a larger size, that mean larger compression...
LecturePg. 105-120Major uprates of process compressor train performance can be achieved utilizing th...