International audienceA heterogeneous network, where a switched-Ethernet backbone, e.g. AFDX, interconnects several end systems based on Network-on-Chip (NoC), is a promising candidate to build new avionics architectures. When using such a heterogeneous network for real-time applications, a global worst-case traversal time (WCTT) analysis is needed. In this short paper we focus on the intra-NoC communication on a Tilera TILE64-like NoC. First, we extend the Recursive Calculus (RC) to achieve tighter intra-NoC WCTT. Then, we explain how this intra-NoC WCTT analysis could be used in a compositional manner for the end-to-end inter-NoC delay analysis
Networks-on-chip (NoCs) are an emergent communication infrastructure, which can be designed to deal ...
The recent line of Versal FPGA devices from Xilinx Inc. includes a hard Network-On-Chip (NoC) embedd...
This tutorial reviews four popular mathematical formalisms – dataflow analysis, schedulability analy...
A heterogeneous network, where a switched-Ethernet backbone, e.g. AFDX, interconnects several end sy...
International audiencen this paper, we consider two Network-on-Chip (NoC) architectures used within ...
“Many-core” systems based on a Network-on-Chip (NoC) architecture offer various opportunities in ter...
International audienceAn heterogeneous network, where a switched-Ethernet backbone, as AFDX, interco...
Nowadays, a real-time embedded system often has to cope with flows with different criticality levels...
Network On Chip (NoC) integrate real time application that require strength performance guaranties, ...
In this paper, we present a novel real-time analysis framework for AFDX (Avionics Full Duplex Switch...
In this work, we propose a new, accurate, and comprehensive analytical model for Network-on-Chip (No...
Switched Ethernet is increasingly used in real-time communication due to its intrinsic features such...
Conference of 28th Euromicro Conference on Real-Time Systems, ECRTS 2016 ; Conference Date: 5 July 2...
A Network on Chip is the communication system on an integrated circuit that enables the IP cores to ...
International audience—In this paper, we consider the problem of guaranteeing real-time end-to-end t...
Networks-on-chip (NoCs) are an emergent communication infrastructure, which can be designed to deal ...
The recent line of Versal FPGA devices from Xilinx Inc. includes a hard Network-On-Chip (NoC) embedd...
This tutorial reviews four popular mathematical formalisms – dataflow analysis, schedulability analy...
A heterogeneous network, where a switched-Ethernet backbone, e.g. AFDX, interconnects several end sy...
International audiencen this paper, we consider two Network-on-Chip (NoC) architectures used within ...
“Many-core” systems based on a Network-on-Chip (NoC) architecture offer various opportunities in ter...
International audienceAn heterogeneous network, where a switched-Ethernet backbone, as AFDX, interco...
Nowadays, a real-time embedded system often has to cope with flows with different criticality levels...
Network On Chip (NoC) integrate real time application that require strength performance guaranties, ...
In this paper, we present a novel real-time analysis framework for AFDX (Avionics Full Duplex Switch...
In this work, we propose a new, accurate, and comprehensive analytical model for Network-on-Chip (No...
Switched Ethernet is increasingly used in real-time communication due to its intrinsic features such...
Conference of 28th Euromicro Conference on Real-Time Systems, ECRTS 2016 ; Conference Date: 5 July 2...
A Network on Chip is the communication system on an integrated circuit that enables the IP cores to ...
International audience—In this paper, we consider the problem of guaranteeing real-time end-to-end t...
Networks-on-chip (NoCs) are an emergent communication infrastructure, which can be designed to deal ...
The recent line of Versal FPGA devices from Xilinx Inc. includes a hard Network-On-Chip (NoC) embedd...
This tutorial reviews four popular mathematical formalisms – dataflow analysis, schedulability analy...