Current 4D CAD systems can perform basic functions to construct a 4D simulation to visualize a construction schedule. One important function is to link the schedule to a 3D object because it is the most basic and essential process necessary to create a 4D simulation. Though the link process in existing systems is still somewhat complicated, it can be simplified by changing the information structure of the system. Because the 4D system includes the schedule, 3D objects, and 4D simulations, the database of the system stores various information. Accordingly, information management in a 4D system is an important factor to serve the user's convenience and to simplify the link between a construction schedule and drawings. This study presents an e...
Lack of adequate visualization of project construction operations often causes project parties to st...
Federal Highway Administration2016PDFBriefUnited States. Federal Highway AdministrationSchneider, Ch...
The ability to visualize a project via a 4D CAD model (3D CAD model with time as the 4th dimension) ...
4D CAD system for construction management means a tool that represents the completed appearance of 3...
Research has demonstrated that four-dimensional computer aided design (4D CAD), in which a three-dim...
Visualization of construction schedules has much improved through the development of 4D modeling too...
Visualization of construction schedules has much improved through the development of 4D modeling too...
4D modeling integrates 3D model with project time schedule to provide virtual simulation for identif...
Abstract: Visual 4D planning and scheduling technique that combines 3D CAD models with construction ...
For construction projects implemented in a congested area, the ability to understand spatial relatio...
Since the early 1990s, there has been a growing interest in four-dimensional computer aided design (...
Author name used in this publication: K. W. Chau2004-2005 > Academic research: refereed > Publicatio...
Four-dimensional (4D) models link three-dimensional geometrical models with construction schedule da...
With the increasing complexity of modern construction projects, there is a pressing need on higher d...
The objective of this paper is to report on the development of an integrated database to act as an i...
Lack of adequate visualization of project construction operations often causes project parties to st...
Federal Highway Administration2016PDFBriefUnited States. Federal Highway AdministrationSchneider, Ch...
The ability to visualize a project via a 4D CAD model (3D CAD model with time as the 4th dimension) ...
4D CAD system for construction management means a tool that represents the completed appearance of 3...
Research has demonstrated that four-dimensional computer aided design (4D CAD), in which a three-dim...
Visualization of construction schedules has much improved through the development of 4D modeling too...
Visualization of construction schedules has much improved through the development of 4D modeling too...
4D modeling integrates 3D model with project time schedule to provide virtual simulation for identif...
Abstract: Visual 4D planning and scheduling technique that combines 3D CAD models with construction ...
For construction projects implemented in a congested area, the ability to understand spatial relatio...
Since the early 1990s, there has been a growing interest in four-dimensional computer aided design (...
Author name used in this publication: K. W. Chau2004-2005 > Academic research: refereed > Publicatio...
Four-dimensional (4D) models link three-dimensional geometrical models with construction schedule da...
With the increasing complexity of modern construction projects, there is a pressing need on higher d...
The objective of this paper is to report on the development of an integrated database to act as an i...
Lack of adequate visualization of project construction operations often causes project parties to st...
Federal Highway Administration2016PDFBriefUnited States. Federal Highway AdministrationSchneider, Ch...
The ability to visualize a project via a 4D CAD model (3D CAD model with time as the 4th dimension) ...