This paper considers the scheduling problem in hybrid flow shops with parallel machines at each serial production stage. Each job may visit each stage several times, called the re-entrant flows. As an extension of the research on generic re-entrant hybrid flow shop scheduling, the unrelated parallel machines at each stage are considered and hence the processing time of a job at each stage depends on the machine where the job is processed. The problem is to determine the allocation of jobs to the unrelated parallel machines as well as the sequence of the jobs assigned to each machine for the bicriteria objectives of minimizing makespan and total tardiness. Since due dates must be satisfied after being negotiated with customers in most practi...
Most scheduling problems are combinatorial optimization problems which are too difficult to be solve...
Abstract: This paper studies the hybrid flow-shop scheduling problem with no-wait restriction. The p...
We present a branch and bound algorithm for a two-machine re-entrant flowshop scheduling problem wit...
This paper considers a two-stage hybrid flow shop scheduling problem for the objective of minimizing...
AbstractThis paper focuses on a two machine re-entrant flow shop scheduling problem with the objecti...
We consider a generalization of the permutation flow shop problem of scheduling n jobs on m machine ...
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are p...
In the paper, the flow-shop scheduling problem with parallel machines at each stage (machine center)...
We analyse the industrial system and propose a model for the overall process. This model possesses ...
Abstract. The goal of this paper is to investigate scheduling heuristics to seek the minimum of a po...
Abstract. This paper investigates scheduling heuristics to seek the minimum of a positively weighted...
This paper considers the hybrid flow shop scheduling problem. Most real world scheduling problems ar...
The scheduling of flow shops with multiple parallel machines per stage, usually referred to as the H...
International audienceWe study the scheduling of N jobs in a V-stage hybrid flow shop with identical...
This research focuses on the Hybrid Flow Shop production scheduling problem, which is one of the mos...
Most scheduling problems are combinatorial optimization problems which are too difficult to be solve...
Abstract: This paper studies the hybrid flow-shop scheduling problem with no-wait restriction. The p...
We present a branch and bound algorithm for a two-machine re-entrant flowshop scheduling problem wit...
This paper considers a two-stage hybrid flow shop scheduling problem for the objective of minimizing...
AbstractThis paper focuses on a two machine re-entrant flow shop scheduling problem with the objecti...
We consider a generalization of the permutation flow shop problem of scheduling n jobs on m machine ...
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are p...
In the paper, the flow-shop scheduling problem with parallel machines at each stage (machine center)...
We analyse the industrial system and propose a model for the overall process. This model possesses ...
Abstract. The goal of this paper is to investigate scheduling heuristics to seek the minimum of a po...
Abstract. This paper investigates scheduling heuristics to seek the minimum of a positively weighted...
This paper considers the hybrid flow shop scheduling problem. Most real world scheduling problems ar...
The scheduling of flow shops with multiple parallel machines per stage, usually referred to as the H...
International audienceWe study the scheduling of N jobs in a V-stage hybrid flow shop with identical...
This research focuses on the Hybrid Flow Shop production scheduling problem, which is one of the mos...
Most scheduling problems are combinatorial optimization problems which are too difficult to be solve...
Abstract: This paper studies the hybrid flow-shop scheduling problem with no-wait restriction. The p...
We present a branch and bound algorithm for a two-machine re-entrant flowshop scheduling problem wit...