This paper presents a procedure to individuate the optimal retrofitting strategy for electric power networks (EPN) subjected to seismic events. The optimization consists in the minimization, under economic constraints, of the probability of power cut-off at the nodes where electric energy is most needed in the post-earthquake situation; these ones will be referred to as critical nodes. The model of EPN used herein has been already presented [1, 2] and is briefly recalled in the text. The method to individuate the critical nodes, based upon the value of an index herein proposed, is first illustrated(1); then the optimization procedure for the choice of the elements of the EPN to upgrade is examined, based upon a standard reliability study. I...
157 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2007.This study develops an approa...
Recent natural disasters have raised the question of how communities can recover from extreme events...
Under which conditions is it economically convenient to seismic retrofit a structure? This paper pre...
This paper presents a procedure to individuate the optimal retrofitting strategy for electric power ...
The paper illustrates a procedure to assess the territorial risk of electric power black – out when ...
This paper presents a procedure for the assessment and improvement of the performance of existing tr...
The optimal allocation of available economic resources for seismic upgrading of an existing lifeline...
In emergency situations, it is necessary to safely evacuate the population in order to save lives. T...
My research has focused on two inter-related questions. First, how do we model the impacts of terror...
This paper develops a two-stage stochastic program and solution procedure to optimize the selection ...
The occurrence of a natural disaster such as a strong earthquake affects not only the capacity of a ...
In past works the authors set up a refined model for electric power networks under earthquake action...
Transportation and utility networks (e.g., water delivery, power, and oil systems) are essential in...
A mixed-integer nonlinear program is developed to help optimize post-earthquake electric power resto...
The optimization of preventive upgrading interventions on the bridges of a highway network in an ear...
157 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2007.This study develops an approa...
Recent natural disasters have raised the question of how communities can recover from extreme events...
Under which conditions is it economically convenient to seismic retrofit a structure? This paper pre...
This paper presents a procedure to individuate the optimal retrofitting strategy for electric power ...
The paper illustrates a procedure to assess the territorial risk of electric power black – out when ...
This paper presents a procedure for the assessment and improvement of the performance of existing tr...
The optimal allocation of available economic resources for seismic upgrading of an existing lifeline...
In emergency situations, it is necessary to safely evacuate the population in order to save lives. T...
My research has focused on two inter-related questions. First, how do we model the impacts of terror...
This paper develops a two-stage stochastic program and solution procedure to optimize the selection ...
The occurrence of a natural disaster such as a strong earthquake affects not only the capacity of a ...
In past works the authors set up a refined model for electric power networks under earthquake action...
Transportation and utility networks (e.g., water delivery, power, and oil systems) are essential in...
A mixed-integer nonlinear program is developed to help optimize post-earthquake electric power resto...
The optimization of preventive upgrading interventions on the bridges of a highway network in an ear...
157 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2007.This study develops an approa...
Recent natural disasters have raised the question of how communities can recover from extreme events...
Under which conditions is it economically convenient to seismic retrofit a structure? This paper pre...