The Cost-Time Profile is a tool that presents the combined impact of disbursements made during the execution of a project, and their timing. The Cost-Time Profile chart presents the accumulated cost at any given time, and the area under the curve is the Cost-Time Investment. This Cost-Time Investment has a quantifiable impact on the working capital the company uses, and it is also useful for the determination of the Direct Cost of a product. This paper aims to develop a model to create the schedule of activities that minimizes the Cost-Time Investment for a project
The failure of the traditional critical path methods (CPM) to model realistically the different time...
Vita.This dissertation develops improvements to a new project scheduling procedure being developed a...
The discrete time/cost trade-off problem assumes the duration of project activities to be discrete, ...
The Cost-Time Profile (CTP) is a tool that presents graphically the accumulation, of direct costs on...
In managing a project, there is often the option of applying additional funds to reduce the processi...
Successful performance and completion of construction projects highly depend on an adequate time sch...
The primary objective of this research is to develop a network planning model which considers the ti...
Abstract: Project is mainly about achieving certain objectives within limited time, cost, ...
In this article the problem of time management in the planning of execution for development programs...
Crashing project activities is a typical way to shorten their completion times to meet project due d...
Planning the duration of works in order to optimize the implementation time is an important componen...
Planning the duration of works in order to optimize the implementation time is an important componen...
AbstractModern project management has developed numerous techniques based on mathematical models in ...
Proposes a heuristic iterative scheduling algorithm for the resource constrained project scheduling ...
Today, many enterprises in different industries take part in various projects, and organizational pe...
The failure of the traditional critical path methods (CPM) to model realistically the different time...
Vita.This dissertation develops improvements to a new project scheduling procedure being developed a...
The discrete time/cost trade-off problem assumes the duration of project activities to be discrete, ...
The Cost-Time Profile (CTP) is a tool that presents graphically the accumulation, of direct costs on...
In managing a project, there is often the option of applying additional funds to reduce the processi...
Successful performance and completion of construction projects highly depend on an adequate time sch...
The primary objective of this research is to develop a network planning model which considers the ti...
Abstract: Project is mainly about achieving certain objectives within limited time, cost, ...
In this article the problem of time management in the planning of execution for development programs...
Crashing project activities is a typical way to shorten their completion times to meet project due d...
Planning the duration of works in order to optimize the implementation time is an important componen...
Planning the duration of works in order to optimize the implementation time is an important componen...
AbstractModern project management has developed numerous techniques based on mathematical models in ...
Proposes a heuristic iterative scheduling algorithm for the resource constrained project scheduling ...
Today, many enterprises in different industries take part in various projects, and organizational pe...
The failure of the traditional critical path methods (CPM) to model realistically the different time...
Vita.This dissertation develops improvements to a new project scheduling procedure being developed a...
The discrete time/cost trade-off problem assumes the duration of project activities to be discrete, ...