High pore water pressures were measured in the fill material of the Thika Dam embankment early in its construction. These caused concern about the subsequent short term stability. Therefore construction was stopped. Stability reassessment and drainage design was performed using finite element analyses before construction was allowed to continue. Different methods of modelling the pore water pressure allowed efficient analysis of various drainage options. The analyses highlighted zones of high shear stress and shear strain, and formation of failure surfaces. They established the necessary level of drainage required to ensure stability, control movement and reduce the risk of residual shear surfaces. Large toe movement was predicted immediate...
The release of tailings and impounded water after dam breaches has had catastrophic consequences for...
The 3D finite element analyses were performed for the gradual raisings of a corner section of Aitik ...
This paper presents a stability parametric analysis of a 59m high embankment dam. The analysis was p...
Thesis: M. Eng., Massachusetts Institute of Technology, Department of Civil and Environmental Engine...
This paper presents a case study of how the finite element methodcan be utilized to analyze stabilit...
Over the lifetime of a dam several measures are usually taken in order to assure the stability and t...
Uplift pressure is one of the most dominant forces on a dam structure. Difference in head water and ...
A case study is presented in this paper which describes finite element analysis of staged constructi...
Mollasadra dam is an earth fill dam with a clayey core and a height of 72 m from river bed, construc...
Embankment dams encounter several problems in terms of dam safety. One of those problems is called i...
Upstream tailings dams may experience slope stability problems when the rate of raising is too fast....
One of the challenges in upstream tailings dam projects is to ensure the allowable rate of depositio...
Numerical analysis for the safe rate determination of lowering of an embankment dam was performed in...
The goal of this study was stability analysis of the upstream slope of earthen dams using the finite...
Placing a geomembrane liner in the core of a dam is an alternative construction technique to traditi...
The release of tailings and impounded water after dam breaches has had catastrophic consequences for...
The 3D finite element analyses were performed for the gradual raisings of a corner section of Aitik ...
This paper presents a stability parametric analysis of a 59m high embankment dam. The analysis was p...
Thesis: M. Eng., Massachusetts Institute of Technology, Department of Civil and Environmental Engine...
This paper presents a case study of how the finite element methodcan be utilized to analyze stabilit...
Over the lifetime of a dam several measures are usually taken in order to assure the stability and t...
Uplift pressure is one of the most dominant forces on a dam structure. Difference in head water and ...
A case study is presented in this paper which describes finite element analysis of staged constructi...
Mollasadra dam is an earth fill dam with a clayey core and a height of 72 m from river bed, construc...
Embankment dams encounter several problems in terms of dam safety. One of those problems is called i...
Upstream tailings dams may experience slope stability problems when the rate of raising is too fast....
One of the challenges in upstream tailings dam projects is to ensure the allowable rate of depositio...
Numerical analysis for the safe rate determination of lowering of an embankment dam was performed in...
The goal of this study was stability analysis of the upstream slope of earthen dams using the finite...
Placing a geomembrane liner in the core of a dam is an alternative construction technique to traditi...
The release of tailings and impounded water after dam breaches has had catastrophic consequences for...
The 3D finite element analyses were performed for the gradual raisings of a corner section of Aitik ...
This paper presents a stability parametric analysis of a 59m high embankment dam. The analysis was p...