This paper discusses the seismic risk of some structures designed, modeled and analyzed within the RINTC (Rischio Implicito di strutture progettate secondo le Norme Tecniche per le Costruzioni) project. RINTC, funded by the Italian Department for Civil Protection is a multiple-year effort that started in 2015 as a joint collaboration between ReLUIS (Rete dei Laboratori Universitari di Ingegneria Sismica) and EUCENTRE (Centro Europeo di Formazione e Ricerca in Ingegneria Sismica). In the project, the structures, with a variety of structural types, configurations and locations, spanning a wide range of seismic hazard levels, were designed in compliance with the current Italian code provisions, while their seismic risk was computed, in terms o...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...
This paper discusses the seismic risk of some structures designed, modeled and analyzed within the R...
RINTC, which started in 2015, is a joint proj ect of ReLUIS and EUCENTRE, two centers of competen...
RINTC, which started in 2015, is a joint proj ect of ReLUIS and EUCENTRE, two centers of competen...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of coll...
The RINTC (2015–2017) project was a three-year research program aimed at assessing the seismic relia...
The RINTC research project (RINTC Workgroup, 2018), financed by the Italian Department of Civil Prot...
This report collects the 2015-2017 deliverables of the RINTC project, which has been a joint projec...
This report collects the 2015-2017 deliverables of the RINTC project, which has been a joint projec...
This report collects the 2015-2017 deliverables of the RINTC project, which has been a joint projec...
The RINTC (2015–2017) project was a three-year research program aimed at assessing the seismic relia...
This report collects the 2015-2017 deliverables of the RINTC project, which has been a joint projec...
The RINTC research project (RINTC Workgroup, 2018), financed by the Italian Department of Civil Prot...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...
This paper discusses the seismic risk of some structures designed, modeled and analyzed within the R...
RINTC, which started in 2015, is a joint proj ect of ReLUIS and EUCENTRE, two centers of competen...
RINTC, which started in 2015, is a joint proj ect of ReLUIS and EUCENTRE, two centers of competen...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of coll...
The RINTC (2015–2017) project was a three-year research program aimed at assessing the seismic relia...
The RINTC research project (RINTC Workgroup, 2018), financed by the Italian Department of Civil Prot...
This report collects the 2015-2017 deliverables of the RINTC project, which has been a joint projec...
This report collects the 2015-2017 deliverables of the RINTC project, which has been a joint projec...
This report collects the 2015-2017 deliverables of the RINTC project, which has been a joint projec...
The RINTC (2015–2017) project was a three-year research program aimed at assessing the seismic relia...
This report collects the 2015-2017 deliverables of the RINTC project, which has been a joint projec...
The RINTC research project (RINTC Workgroup, 2018), financed by the Italian Department of Civil Prot...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...
This paper reports on the results of an ongoing Research Project aimed at computing the risk of col...