This master thesis examine how a low temperature radiator systemcan be implemented in a new built office and what effects this will have on the return temperature. One point in the system was logged and data was collected. A model was then developed in VIP-Energy to determine the heating demand for an office building which were compared to the supply. A cost analysis was also performed on different types of low temperature radiator systems. These were compared to a conventional radiator system with a supply temperature of 55°C and a return temperature of 45°C. A cost analysis was also done on whether to build energy efficient or not. The study shows a strong correlation between the heat demand and the time of day. The demand is low during o...
The heating of companies premises is today functional with electrical heating and heating of fossil ...
When an energy simulation is performed for buildings it generates in lower energy consumption than w...
The aim of this thesis was to evaluate new buildings with low-temperature heating systems in terms o...
This master thesis examine how a low temperature radiator systemcan be implemented in a new built of...
An office building (sthlm new hus 4) located in the south of Hammarbyhamnen overlooking Hammarbyback...
An office building (sthlm new hus 4) located in the south of Hammarbyhamnen overlooking Hammarbyback...
An office building (sthlm new hus 4) located in the south of Hammarbyhamnen overlooking Hammarbyback...
Energy consumption for heating and ventilation of buildings is still in 2011considered far too high,...
Heating systems in an office. Building simulation Heating is one of essential parts of building’s HV...
This master thesis investigates the Norwegian standard for calculating necessary power demand, NS-EN...
The use of air-conditioning and comfort cooling in offices and stores has been increasing during rec...
Due to desirable emission reductions and population growth, increasing energy demand is identified a...
This thesis was conducted at Luleå University of Technology in cooperation with Norconsult AB and Li...
This thesis was conducted at Luleå University of Technology in cooperation with Norconsult AB and Li...
This thesis was conducted at Luleå University of Technology in cooperation with Norconsult AB and Li...
The heating of companies premises is today functional with electrical heating and heating of fossil ...
When an energy simulation is performed for buildings it generates in lower energy consumption than w...
The aim of this thesis was to evaluate new buildings with low-temperature heating systems in terms o...
This master thesis examine how a low temperature radiator systemcan be implemented in a new built of...
An office building (sthlm new hus 4) located in the south of Hammarbyhamnen overlooking Hammarbyback...
An office building (sthlm new hus 4) located in the south of Hammarbyhamnen overlooking Hammarbyback...
An office building (sthlm new hus 4) located in the south of Hammarbyhamnen overlooking Hammarbyback...
Energy consumption for heating and ventilation of buildings is still in 2011considered far too high,...
Heating systems in an office. Building simulation Heating is one of essential parts of building’s HV...
This master thesis investigates the Norwegian standard for calculating necessary power demand, NS-EN...
The use of air-conditioning and comfort cooling in offices and stores has been increasing during rec...
Due to desirable emission reductions and population growth, increasing energy demand is identified a...
This thesis was conducted at Luleå University of Technology in cooperation with Norconsult AB and Li...
This thesis was conducted at Luleå University of Technology in cooperation with Norconsult AB and Li...
This thesis was conducted at Luleå University of Technology in cooperation with Norconsult AB and Li...
The heating of companies premises is today functional with electrical heating and heating of fossil ...
When an energy simulation is performed for buildings it generates in lower energy consumption than w...
The aim of this thesis was to evaluate new buildings with low-temperature heating systems in terms o...