The facilities for testing hydro turbine is not many in Malaysia, hence flume project is initialize to overcome this problem. This study is about on choosing the best reservoir designs that need to be implement in flume project, to choose the best the design, there are analysis that need to be done, stress and strain analysis, CFD analysis and costing analysis also should be include. Throughout the analysis, the main parameter of choosing reservoir design can be recognize, in this study there are two main parameters for choosing the best tank design that is, pressure drop and costing. The need of reservoir generally in term of costing for the whole project is because a costly pipe material would be required to withstanding a very high press...
Many bridges are destroyed or fail completely during severe floods. If the cause of the damage is no...
At present, there is very few published literature for optimizing of rectangular type ground reservo...
Criterion have been developed in this study for designing a stilling basin to serve as a transition ...
The needs of renewable energy is now in urgency as the source of the fossil energy is depleting from...
Open channel flumes which will be built on the ground level need a support structure to minimize the...
The increase on the usage of non-renewable energy has caused high demanding on energy supplies. This...
A water channel for performing flow visualization and studying scale models in fluid mechanics was d...
A Thesis submitted to the Department of Civil Engineering for the Degree of Master Engineering in St...
This paper presents the results of a combined approach - concept design, Computational Fluid Dynamic...
The Batang Agam Hydroelectric Power Plant is a run of river type plant that has water purification s...
High pore water pressures were measured in the fill material of the Thika Dam embankment early in it...
The design problems of reservoirs for collection, safekeeping and utilization of aggressive sewage a...
Ho Chi Minh City is flooded on a regular basis due to the lack of flood protection. Plans have been ...
Bener Reservoir construction is an initial plan that will function for the purposes of irrigation, e...
ABSTRAK Kapasitas spillway Bendungan Darma perlu tinjauan kembali mengenai kemampuannya dalam menjag...
Many bridges are destroyed or fail completely during severe floods. If the cause of the damage is no...
At present, there is very few published literature for optimizing of rectangular type ground reservo...
Criterion have been developed in this study for designing a stilling basin to serve as a transition ...
The needs of renewable energy is now in urgency as the source of the fossil energy is depleting from...
Open channel flumes which will be built on the ground level need a support structure to minimize the...
The increase on the usage of non-renewable energy has caused high demanding on energy supplies. This...
A water channel for performing flow visualization and studying scale models in fluid mechanics was d...
A Thesis submitted to the Department of Civil Engineering for the Degree of Master Engineering in St...
This paper presents the results of a combined approach - concept design, Computational Fluid Dynamic...
The Batang Agam Hydroelectric Power Plant is a run of river type plant that has water purification s...
High pore water pressures were measured in the fill material of the Thika Dam embankment early in it...
The design problems of reservoirs for collection, safekeeping and utilization of aggressive sewage a...
Ho Chi Minh City is flooded on a regular basis due to the lack of flood protection. Plans have been ...
Bener Reservoir construction is an initial plan that will function for the purposes of irrigation, e...
ABSTRAK Kapasitas spillway Bendungan Darma perlu tinjauan kembali mengenai kemampuannya dalam menjag...
Many bridges are destroyed or fail completely during severe floods. If the cause of the damage is no...
At present, there is very few published literature for optimizing of rectangular type ground reservo...
Criterion have been developed in this study for designing a stilling basin to serve as a transition ...