Wendelstein 7-X (W7-X) is a large optimized stellarator (B=2.5T, V=30m3) aiming at demonstrating the reactor relevance of the optimized stellarators. In 2015 W7-X will begin its first operation phase (OP1.1) with five inertially cooled inboard limiters made of graphite. Assuming the heat loads can be spread out evenly between the limiters, 1 second discharges at 2 MW of ECRH heating power could be run in OP1.1. The expected plasma parameters will be sufficient to demonstrate the readiness of the installed diagnostics and even to run a first physics program. The diagnostics available for this first operation phase, including some special limiter diagnostics, and their capabilities are being presented
The gain in experience with long-pulse operation under fusion relevant plasma conditions is an impor...
The Wendelstein 7-X project is aimed at demonstrating that an optimised stellarator is an attractive...
During the first operational phase (referred to as OP1.1) of the new Wendelstein 7-X (W7-X) stellara...
Wendelstein 7-X (W7-X) is a large optimized stellarator (B=2.5T, V=30m3) aiming at demonstrating the...
ABSTRACT: Wendelstein 7-X (W7-X) is a large optimized stellarator (B=2.5T, V=30m3) aiming at demonst...
Wendelstein 7-X, a superconducting optimized stellarator built in Greifswald/Germany, started its fi...
The gain in experience with long-pulse operation under fusion relevant plasma conditions is an impor...
After completing the main construction phase of Wendelstein 7-X (W7-X) and successfully commissionin...
The gain in experience with long-pulse operation under fusion relevant plasma conditions is an impor...
The Wendelstein 7-X project is aimed at demonstrating that an optimised stellarator is an attractive...
During the first operational phase (referred to as OP1.1) of the new Wendelstein 7-X (W7-X) stellara...
Wendelstein 7-X (W7-X) is a large optimized stellarator (B=2.5T, V=30m3) aiming at demonstrating the...
ABSTRACT: Wendelstein 7-X (W7-X) is a large optimized stellarator (B=2.5T, V=30m3) aiming at demonst...
Wendelstein 7-X, a superconducting optimized stellarator built in Greifswald/Germany, started its fi...
The gain in experience with long-pulse operation under fusion relevant plasma conditions is an impor...
After completing the main construction phase of Wendelstein 7-X (W7-X) and successfully commissionin...
The gain in experience with long-pulse operation under fusion relevant plasma conditions is an impor...
The Wendelstein 7-X project is aimed at demonstrating that an optimised stellarator is an attractive...
During the first operational phase (referred to as OP1.1) of the new Wendelstein 7-X (W7-X) stellara...