The outcomes of an experimental study on local scour at a pile cap are presented. Experiments were conducted with the approaching flow having an undisturbed flow depth and a threshold flow velocity. The main variables investigated were pile cap dimensions and location relative to the streambed. According to the rate of change in scour depth, the scour at a pile cap for different cap levels was divided into four cases. Equations for a correction factor for these four cases are derived. The correction factor Kc has the effect of reducing the scour depth from a corresponding full-depth pier of the same width as the pile cap. A new methodology is presented to estimate local scour depth at a pile cap as a component of a complex pier. The propose...
A scour depth prediction formula for a river bridge is established using experimental data in which ...
Rate of scour adjacent to piled foundations may result in rapidly loss of skin friction and load bea...
Estimation of maximum possible scour depth around bridge piers is an important step in the design of...
The prediction of scour depths at bridge piers is a necessary input to the design of the pier founda...
An experimental investigation of clear water scour at complex piers is presented. Five complex piers...
Over the past decades, great strides have been made in the ability to accurately predict design sco...
The most existing pier-scour equations mainly apply to uniformly shaped piers. However, pier footing...
The construction of bridges in alluvial channels will cause a contraction in the waterway at the bri...
River bridge piers may collapse due to the local scour around their foundations. It is known that lo...
A complex bridge pier is an assembly of a column and foundation such as pile foundation with a pile-...
Local scour around bridge piers has been recognised as one of the major causes of bridge failure. Si...
The main aim of this study was to gain a deeper knowledge of flow behaviour and scour formation adja...
Local scour around bridge piers is one of the main causes of bridge failures. In this study, scour d...
Experiments were performed for local scour at a complex pier with two inclined, rectangular columns ...
This study is based on laboratory experiments for computing depth of local scour around group bridge...
A scour depth prediction formula for a river bridge is established using experimental data in which ...
Rate of scour adjacent to piled foundations may result in rapidly loss of skin friction and load bea...
Estimation of maximum possible scour depth around bridge piers is an important step in the design of...
The prediction of scour depths at bridge piers is a necessary input to the design of the pier founda...
An experimental investigation of clear water scour at complex piers is presented. Five complex piers...
Over the past decades, great strides have been made in the ability to accurately predict design sco...
The most existing pier-scour equations mainly apply to uniformly shaped piers. However, pier footing...
The construction of bridges in alluvial channels will cause a contraction in the waterway at the bri...
River bridge piers may collapse due to the local scour around their foundations. It is known that lo...
A complex bridge pier is an assembly of a column and foundation such as pile foundation with a pile-...
Local scour around bridge piers has been recognised as one of the major causes of bridge failure. Si...
The main aim of this study was to gain a deeper knowledge of flow behaviour and scour formation adja...
Local scour around bridge piers is one of the main causes of bridge failures. In this study, scour d...
Experiments were performed for local scour at a complex pier with two inclined, rectangular columns ...
This study is based on laboratory experiments for computing depth of local scour around group bridge...
A scour depth prediction formula for a river bridge is established using experimental data in which ...
Rate of scour adjacent to piled foundations may result in rapidly loss of skin friction and load bea...
Estimation of maximum possible scour depth around bridge piers is an important step in the design of...