International audienceIn this paper, we are interested in mine planning under uncertainty on the capacity of extraction in a mine complex. Indeed, in real life there is always a gap between planned activities and activities carried out during the period. In this paper, we focus on the activity of extraction. In order to achieve this challenge, we proposed a model to represent the mining complex. This model takes into account the uncertainty on the capacity by the use of scenarios. In order to face the uncertainty on the capacity of extraction we propose a robust approach with the MaxMin decision criterion. To the best of our knowledge, while the bulk of the literature treats the optimization in mining complex with stochastic approaches, thi...
In this paper, we investigate the impact of uncertainty in advanced mine optimisation. We consider M...
Summarization: The effect of uncertainty sources to the stochastic optimization of the combined proj...
The complexity of an open pit production scheduling problem is increased by grade uncertainty. A met...
In this paper, we are interested in mine planning under uncertainty on the capacity of extraction in...
Many projects fail because project performance in unfavourable economic conditions was not anticipat...
AbstractMining complexes contain multiple sequential activities that are strongly interrelated. Extr...
The mining complex refers to an integrated problem where the material is extracted from the mines; t...
Accuracy in predictions leads to better planning with a minimum of opportunity lost. In open pit min...
Conventional open pit mine optimization models for designing mining phases and ultimate pit limit do...
Mining operations typically face critical operational decisions based on uncertain information. This...
In the context of planning the exploitation of an open-pit mine, the final pit limit problem consist...
Over recent years, new methods have been developed to integrate uncertainty into the optimization of...
The mine production schedule defines the sequence of extraction of selected mine units over the life...
Long-term open-pit mine planning is a critical stage of a mining project that seeks to establish the...
The mine production scheduling defines the sequence of extraction of mine mining blocks over the lif...
In this paper, we investigate the impact of uncertainty in advanced mine optimisation. We consider M...
Summarization: The effect of uncertainty sources to the stochastic optimization of the combined proj...
The complexity of an open pit production scheduling problem is increased by grade uncertainty. A met...
In this paper, we are interested in mine planning under uncertainty on the capacity of extraction in...
Many projects fail because project performance in unfavourable economic conditions was not anticipat...
AbstractMining complexes contain multiple sequential activities that are strongly interrelated. Extr...
The mining complex refers to an integrated problem where the material is extracted from the mines; t...
Accuracy in predictions leads to better planning with a minimum of opportunity lost. In open pit min...
Conventional open pit mine optimization models for designing mining phases and ultimate pit limit do...
Mining operations typically face critical operational decisions based on uncertain information. This...
In the context of planning the exploitation of an open-pit mine, the final pit limit problem consist...
Over recent years, new methods have been developed to integrate uncertainty into the optimization of...
The mine production schedule defines the sequence of extraction of selected mine units over the life...
Long-term open-pit mine planning is a critical stage of a mining project that seeks to establish the...
The mine production scheduling defines the sequence of extraction of mine mining blocks over the lif...
In this paper, we investigate the impact of uncertainty in advanced mine optimisation. We consider M...
Summarization: The effect of uncertainty sources to the stochastic optimization of the combined proj...
The complexity of an open pit production scheduling problem is increased by grade uncertainty. A met...