This ATM is being issued to summarize the results of the anomaly study instigated as a result of the Apollo 14 problem with Dome Removal Tool insertion on the Fuel Cask Body Release Assembly.prepared by T. E. Reigle
This ATM presents the results of the Apollo 15 Passive Seismic Experiment (PSE) Anomalies Investigat...
Six docking attempts were required to achieve initial latch engagement during the Apollo 14 translun...
Mission anomalies / J. Lobb -- Apollo 16, 17 hardware status / D. Gerke -- Apollo 16, 17 principal i...
The significant anomalies that occurred during the Apollo 15 mission are discussed. The five major a...
The purpose of this ATM is to review and status the BxA effort with respect to the Apollo 15 Anomali...
Due to the limited real-time support of the ALSEP packages, it is difficult to precisely track the a...
This report contains a discussion of the significant anomalies that occurred during the Apollo 15 mi...
This ATM summarizes the results of the BxA study conducted to investigate the ALSEP Flight 1 PSE The...
Since deployment of the Apollo 15 ALSEP, various anomalous events have occurred within the package. ...
This ATM summarizes the results of the BxA study conducted to investigate the ALSEP Flight I PSE The...
f1P i ( 2 0 1970 This A TM summarizes the results of the BxA study conducted to investigate the ALSE...
Since deployment of the Apollo 17 ALSEP, the Lunar Ejecta and Meteorite Experiment (LEAM) has experi...
The Apollo 14 ALSEP downlink signal stopped on 1 March 1975. Efforts to regain a signal, by uplinkin...
Various parameters in the downlink telemetry of Apollo 14 ALSEP appear to be going through cyclic tr...
An investigation was conducted to determine why the temperature of the Lunar Ejecta and Meteorites E...
This ATM presents the results of the Apollo 15 Passive Seismic Experiment (PSE) Anomalies Investigat...
Six docking attempts were required to achieve initial latch engagement during the Apollo 14 translun...
Mission anomalies / J. Lobb -- Apollo 16, 17 hardware status / D. Gerke -- Apollo 16, 17 principal i...
The significant anomalies that occurred during the Apollo 15 mission are discussed. The five major a...
The purpose of this ATM is to review and status the BxA effort with respect to the Apollo 15 Anomali...
Due to the limited real-time support of the ALSEP packages, it is difficult to precisely track the a...
This report contains a discussion of the significant anomalies that occurred during the Apollo 15 mi...
This ATM summarizes the results of the BxA study conducted to investigate the ALSEP Flight 1 PSE The...
Since deployment of the Apollo 15 ALSEP, various anomalous events have occurred within the package. ...
This ATM summarizes the results of the BxA study conducted to investigate the ALSEP Flight I PSE The...
f1P i ( 2 0 1970 This A TM summarizes the results of the BxA study conducted to investigate the ALSE...
Since deployment of the Apollo 17 ALSEP, the Lunar Ejecta and Meteorite Experiment (LEAM) has experi...
The Apollo 14 ALSEP downlink signal stopped on 1 March 1975. Efforts to regain a signal, by uplinkin...
Various parameters in the downlink telemetry of Apollo 14 ALSEP appear to be going through cyclic tr...
An investigation was conducted to determine why the temperature of the Lunar Ejecta and Meteorites E...
This ATM presents the results of the Apollo 15 Passive Seismic Experiment (PSE) Anomalies Investigat...
Six docking attempts were required to achieve initial latch engagement during the Apollo 14 translun...
Mission anomalies / J. Lobb -- Apollo 16, 17 hardware status / D. Gerke -- Apollo 16, 17 principal i...