Concrete is one of the most important, versatile, and widely used building materials worldwide. Thus, an optimized delivery schedule of ready-mixed concrete (RMC) is a critical issue that can reduce CO2 emission from RMC delivery vehicles. RMC is the most popular form of concrete material supplied to construction projects. When delivering RMC to construction sites, optimizing the transportation can be complex since there are many alternatives in terms of route choice. The objective of this research was to optimize the travel operation of RMC delivery vehicles to ensure that they travel via the most economical routes. The researchers developed a dynamic simulation model to solve this vehicle scheduling problem (VSP), applied an ant colony op...
SUMMARY: The increased use of precast components in building and heavy civil engineering projects ha...
Project schedules in construction are responsible for an efficient deployment of resources on the jo...
Companies in the concrete industry are facing the following scheduling problem on a daily basis: con...
Concrete is one of the most important, versatile, and widely used building materials worldwide. Thus...
Ready-Mixed Concrete (RMC) is a perishable product; hence, specifications such as ASTM C94 recommend...
Ready mixed concrete (RMC) is the primary material required for buildings and public infrastructure ...
This research proposes Bee Algorithm (BA) to optimize Ready Mixed Concrete (RMC) truck scheduling pr...
Concrete suppliers are faced with an impressive number of operational challenges – including the acq...
Process of ready mixed concrete (RMC) delivery is an example of multi-objective optimization due to ...
From an operational point of view, Ready-Mixed Concrete Suppliers are faced with challenging operati...
The timely production and distribution of rapidly perishable goods such as ready-mixed concrete is a...
Ready-mixed concrete (RMC) is one of the most common building material for construction industry for...
The traditional scheduling tool Critical Path Method (CPM) exhibits limitations in computational ins...
Construction project control requires reliable delivery schedules. The delivery schedule decisions e...
Nowadays, the ready-mixed concrete (RMC) industry plays an important role in construction projects,...
SUMMARY: The increased use of precast components in building and heavy civil engineering projects ha...
Project schedules in construction are responsible for an efficient deployment of resources on the jo...
Companies in the concrete industry are facing the following scheduling problem on a daily basis: con...
Concrete is one of the most important, versatile, and widely used building materials worldwide. Thus...
Ready-Mixed Concrete (RMC) is a perishable product; hence, specifications such as ASTM C94 recommend...
Ready mixed concrete (RMC) is the primary material required for buildings and public infrastructure ...
This research proposes Bee Algorithm (BA) to optimize Ready Mixed Concrete (RMC) truck scheduling pr...
Concrete suppliers are faced with an impressive number of operational challenges – including the acq...
Process of ready mixed concrete (RMC) delivery is an example of multi-objective optimization due to ...
From an operational point of view, Ready-Mixed Concrete Suppliers are faced with challenging operati...
The timely production and distribution of rapidly perishable goods such as ready-mixed concrete is a...
Ready-mixed concrete (RMC) is one of the most common building material for construction industry for...
The traditional scheduling tool Critical Path Method (CPM) exhibits limitations in computational ins...
Construction project control requires reliable delivery schedules. The delivery schedule decisions e...
Nowadays, the ready-mixed concrete (RMC) industry plays an important role in construction projects,...
SUMMARY: The increased use of precast components in building and heavy civil engineering projects ha...
Project schedules in construction are responsible for an efficient deployment of resources on the jo...
Companies in the concrete industry are facing the following scheduling problem on a daily basis: con...