The Gemini Multi-Conjugate Adaptive Optics project was launched in April 1999 to become the Gemini South AO facility in Chile. The system includes 5 laser guide stars, 3 natural guide stars and 3 deformable mirrors optically conjugated at 0, 4.5 and 9km to achieve near-uniform atmospheric compensation over a 1 arc minute square field of view. Sub-contracted systems with vendors were started as early as October 2001 and were all delivered by July 2007, but for the 50W laser (due around September 2008). The in-house development began in January 2006, and is expected to be completed by the end of 2008 to continue with integration and testing (I&T) on the telescope. The on-sky commissioning phase is scheduled to start during the first half of 2...
AO systems aim at detecting and correcting for optical distortions induced by atmospheric turbulence...
GeMS, the Gemini Laser Guide Star Multi-Conjugate Adaptive Optics facility system, has seen first li...
GeMS, the Gemini South MCAO System, has now been in regular operation since mid-2013 with the imager...
GeMS (the Gemini Multi-conjugated adaptive optics System) is a facility instrument for the Gemini-So...
The Gemini Multi-Conjugate Adaptive Optics System (GeMS) began its on-sky commissioning in January 2...
The Gemini Multi-Conjugate Adaptive Optics system (GeMS) has been in commissioning in the first 5 mo...
The Gemini Observatory is in the final integration and test phase for its Multi-Conjugate Adaptive O...
The Gemini Observatory is planning to implement a Multi Conjugate Adaptive Optics System as a facili...
We present Canopus, the AO bench for Gemini's Multi Conjugate Adaptive Optics System (GEMS), a uniqu...
The Gemini Multi-conjugate adaptive optics System (GeMS) at the Gemini South telescope in Cerro Pach...
International audienceGemini Observatory has been awarded from the National Science Foundation a maj...
The multi-conjugate adaptive optics (MCAO) system design for the Gemini-South 8-meter telescope will...
The Gemini MCAO system, GeMS, is currently undergoing integration and test at the Gemini South ...
The Gemini multiconjugate adaptive optics system-GeMS, a facility instrument mounted on the Gemini S...
We present the results from the commissioning of the Gemini South Adaptive Optics Imager (GSAOI). Ca...
AO systems aim at detecting and correcting for optical distortions induced by atmospheric turbulence...
GeMS, the Gemini Laser Guide Star Multi-Conjugate Adaptive Optics facility system, has seen first li...
GeMS, the Gemini South MCAO System, has now been in regular operation since mid-2013 with the imager...
GeMS (the Gemini Multi-conjugated adaptive optics System) is a facility instrument for the Gemini-So...
The Gemini Multi-Conjugate Adaptive Optics System (GeMS) began its on-sky commissioning in January 2...
The Gemini Multi-Conjugate Adaptive Optics system (GeMS) has been in commissioning in the first 5 mo...
The Gemini Observatory is in the final integration and test phase for its Multi-Conjugate Adaptive O...
The Gemini Observatory is planning to implement a Multi Conjugate Adaptive Optics System as a facili...
We present Canopus, the AO bench for Gemini's Multi Conjugate Adaptive Optics System (GEMS), a uniqu...
The Gemini Multi-conjugate adaptive optics System (GeMS) at the Gemini South telescope in Cerro Pach...
International audienceGemini Observatory has been awarded from the National Science Foundation a maj...
The multi-conjugate adaptive optics (MCAO) system design for the Gemini-South 8-meter telescope will...
The Gemini MCAO system, GeMS, is currently undergoing integration and test at the Gemini South ...
The Gemini multiconjugate adaptive optics system-GeMS, a facility instrument mounted on the Gemini S...
We present the results from the commissioning of the Gemini South Adaptive Optics Imager (GSAOI). Ca...
AO systems aim at detecting and correcting for optical distortions induced by atmospheric turbulence...
GeMS, the Gemini Laser Guide Star Multi-Conjugate Adaptive Optics facility system, has seen first li...
GeMS, the Gemini South MCAO System, has now been in regular operation since mid-2013 with the imager...