This paper presents the design and implementation of the ALICE O2 Control System prototype. The design of our system is based on the ALICE O2 requirements. The system allows the crew operating the experiment to send simple commands in order to control the ongoing processes running in the computing farm. The sent command is capable of reacting to changing conditions and operational the requirements of experiments' processes. The system supports general commands such as pausing or resuming an ongoing activity, applying a new configuration or terminating the current operation and moving it to a standby status. The topics learnt from this study include communication patterns, multi-level communication, distributed systems as well as state machi...
This paper proposes a novel hierarchical control architecture for a class of discrete-event systems....
The ALICE Experiment at CERN LHC (Large Hadron Collider) is undertaking a major upgrade during LHC L...
A complex software environment such as the ALICE Computing Grid infrastructure requires permanent co...
The ALICE Experiment at CERN LHC (Large Hadron Collider) is under preparation for a major upgrade th...
The ALICE Experiment at CERN LHC (Large Hadron Collider) is under preparation for a major upgrade th...
The ALICE (A Large Ion Collider Experiment) Collaboration is preparing major upgrades for the detect...
The Experiment Control System (ECS) is the top level of control of the ALICE experiment. Running an ...
The ALICE Detector Control System (DCS) is based on a commercial SCADA product, running on a large ...
The ALICE (A Large Ion Collider Experiment) Collaboration is preparing major upgrades for the detect...
A new operational design for hierarchical control of discrete-event systems is proposed. The design ...
The commonalities between the ALICE and FAIR experiments and their computing requirements led to the...
The ALICE detector is a dedicated heavy-ion detector currently built at the Large Hadron Collider (L...
The ALICE Experiment at CERN LHC (Large Hadron Collider) is undertaking a major upgrade during LHC L...
A new operational design for hierarchical control of discrete-event systems is proposed. The design ...
The operating conditions and design requirements of the central trigger for the ALICE experiment are...
This paper proposes a novel hierarchical control architecture for a class of discrete-event systems....
The ALICE Experiment at CERN LHC (Large Hadron Collider) is undertaking a major upgrade during LHC L...
A complex software environment such as the ALICE Computing Grid infrastructure requires permanent co...
The ALICE Experiment at CERN LHC (Large Hadron Collider) is under preparation for a major upgrade th...
The ALICE Experiment at CERN LHC (Large Hadron Collider) is under preparation for a major upgrade th...
The ALICE (A Large Ion Collider Experiment) Collaboration is preparing major upgrades for the detect...
The Experiment Control System (ECS) is the top level of control of the ALICE experiment. Running an ...
The ALICE Detector Control System (DCS) is based on a commercial SCADA product, running on a large ...
The ALICE (A Large Ion Collider Experiment) Collaboration is preparing major upgrades for the detect...
A new operational design for hierarchical control of discrete-event systems is proposed. The design ...
The commonalities between the ALICE and FAIR experiments and their computing requirements led to the...
The ALICE detector is a dedicated heavy-ion detector currently built at the Large Hadron Collider (L...
The ALICE Experiment at CERN LHC (Large Hadron Collider) is undertaking a major upgrade during LHC L...
A new operational design for hierarchical control of discrete-event systems is proposed. The design ...
The operating conditions and design requirements of the central trigger for the ALICE experiment are...
This paper proposes a novel hierarchical control architecture for a class of discrete-event systems....
The ALICE Experiment at CERN LHC (Large Hadron Collider) is undertaking a major upgrade during LHC L...
A complex software environment such as the ALICE Computing Grid infrastructure requires permanent co...