Risks pertaining to construction work relate to situations in which various events may randomly change the duration and cost of the project or worsen its quality. Because of possible significant changes of random events, favorable, moderate, and difficult conditions of construction work are considered. It is the first stage of the construction risk analysis. The probabilistic parameters of construction are identified and described by using the design characteristics model of the structure and the construction technology model. The first describes the probabilistic properties of the structure execution’s technology. The second describes the probabilistic properties of the works execution. Both models contain basic probabilistic data for sche...
Building construction work is one of the most dangerous activities among all industries. These works...
Realistic construction estimating requires optimal decisions that not only minimize construction tim...
Risk identification is the most important step in project risk management (PRM), as the risk models ...
Risks pertaining to construction work relate to situations in which various events may randomly chan...
Construction risk assessment is the final and decisive stage of risk analysis. When highly changeabl...
Risks and uncertainties are inherent in construction projects and if neglected these risks often lea...
Construction industry is at the forefront of risk: it involves situations where uncertainty is a nor...
The construction projects are prone to several risk variables that will affect their key features su...
The purpose of this article is to present the preparation of Project Risk Assessment Methodology and...
The study aims to present a brief summary of the results of a methodological research carried out wi...
AbstractThe risk is a measurable part of uncertainty, for which we are able to estimate the occurren...
Many changes have occurred in the construction industry over the past few years as a result of the d...
The aim of this study is to get a better understanding for the effect of the set of the risks in the...
Risk analysis is one of the critical functions of the risk management process. It relies on a detail...
Construction risk assessment is the final and decisive stage of risk analysis. When highly changeabl...
Building construction work is one of the most dangerous activities among all industries. These works...
Realistic construction estimating requires optimal decisions that not only minimize construction tim...
Risk identification is the most important step in project risk management (PRM), as the risk models ...
Risks pertaining to construction work relate to situations in which various events may randomly chan...
Construction risk assessment is the final and decisive stage of risk analysis. When highly changeabl...
Risks and uncertainties are inherent in construction projects and if neglected these risks often lea...
Construction industry is at the forefront of risk: it involves situations where uncertainty is a nor...
The construction projects are prone to several risk variables that will affect their key features su...
The purpose of this article is to present the preparation of Project Risk Assessment Methodology and...
The study aims to present a brief summary of the results of a methodological research carried out wi...
AbstractThe risk is a measurable part of uncertainty, for which we are able to estimate the occurren...
Many changes have occurred in the construction industry over the past few years as a result of the d...
The aim of this study is to get a better understanding for the effect of the set of the risks in the...
Risk analysis is one of the critical functions of the risk management process. It relies on a detail...
Construction risk assessment is the final and decisive stage of risk analysis. When highly changeabl...
Building construction work is one of the most dangerous activities among all industries. These works...
Realistic construction estimating requires optimal decisions that not only minimize construction tim...
Risk identification is the most important step in project risk management (PRM), as the risk models ...