This paper investigates the adequacy of some nontraditional approaches to produce realistic forecasts of the final costs of building projects and compare them with forecasts produced by three traditional methods, the unit area costs (UAC), client detailed costs (UPA), and contract sums (CS). As a case study, data of the actual final costs and forecasts produced using the three traditional methods for 420 finished public building projects carried out in Turkey were collected. Based on 75% of the collected data (i.e., 316 projects), three cost models based on UAC, UPA, and CS were established. The remaining 25% of the data (104 projects) were used as control data for testing the accuracies of forecasts produced by the different approaches. Co...
This research analyzes the uncertainty of unit cost that influences the cost of the frame element of...
Accurate cost estimation at the early stage of a construction project is key factor in a project’s s...
Cost models underlie all the techniques used in construction cost and price forecasting, yet until r...
This paper investigates the adequacy of some nontraditional approaches to produce realistic forecast...
Many construction projects are perceived to perform badly since the majority of them suffer cost ove...
Cost overrun in construction projects is an important problem that can have serious financial conseq...
In Turkey, for the preliminary construction cost estimation, a notice, which is updated and publishe...
In Turkey, for the preliminary construction cost estimation, a notice, which is updated and publishe...
Construction cost estimating is essential for all of the stakeholders of a construction project from...
Estimators and project administrators often administer preliminaries as either function of project c...
Pre-tender estimates are susceptible to inaccuracies (biases) because they are often prepared within...
This research is concerned especially on cost factors affecting the accuracy of building constructio...
The failure of cost anticipation and allocation in construction is attributable to ignorance of the ...
Purpose: The purpose of this paper is to develop a conceptual cost estimation (CCE) model for buildi...
In the construction industry, increasing competition environment has led to decrease in the profit s...
This research analyzes the uncertainty of unit cost that influences the cost of the frame element of...
Accurate cost estimation at the early stage of a construction project is key factor in a project’s s...
Cost models underlie all the techniques used in construction cost and price forecasting, yet until r...
This paper investigates the adequacy of some nontraditional approaches to produce realistic forecast...
Many construction projects are perceived to perform badly since the majority of them suffer cost ove...
Cost overrun in construction projects is an important problem that can have serious financial conseq...
In Turkey, for the preliminary construction cost estimation, a notice, which is updated and publishe...
In Turkey, for the preliminary construction cost estimation, a notice, which is updated and publishe...
Construction cost estimating is essential for all of the stakeholders of a construction project from...
Estimators and project administrators often administer preliminaries as either function of project c...
Pre-tender estimates are susceptible to inaccuracies (biases) because they are often prepared within...
This research is concerned especially on cost factors affecting the accuracy of building constructio...
The failure of cost anticipation and allocation in construction is attributable to ignorance of the ...
Purpose: The purpose of this paper is to develop a conceptual cost estimation (CCE) model for buildi...
In the construction industry, increasing competition environment has led to decrease in the profit s...
This research analyzes the uncertainty of unit cost that influences the cost of the frame element of...
Accurate cost estimation at the early stage of a construction project is key factor in a project’s s...
Cost models underlie all the techniques used in construction cost and price forecasting, yet until r...