This article gives the results of calculating waiting times in the center of an internal beam of a 30 m long bridge, simply supported in reinforced concrete and a beam and ceramic board, over which randomly organized trucks pass, using a Weekly Average Daily Traffic (tpds from its Spanish acronym) count. To make this calculation, the lines of influence methodology for a simply-supported beam is used. The trucks cross the bridge at intervals of 0.1 m, which is the precision used. At each instant, the forces produced by the weight of the truck wheels are calculated, plus the weight of the elements (beams and slabs), randomly applying certain properties of the materials with normal distribution (, and density of the concrete). This procedure ...
The work presented is part of an investigation project conducted by an inquiry group of new material...
To monitor the structural health of a bridge over its lifetime is necessary to have numerical models...
This thesis presents an approach to evaluate and develop a live load model. Although the main purpos...
The reliability index p is a parameter used to estimate the safety of a structure or an element duri...
O aumento nos limites de pesos estabelecidos pela legislação brasileira e o surgimento de novas comb...
The reliability index p is a parameter used to estimate the safety of a structure or an element duri...
Nesta dissertação são avaliados os efeitos dinâmicos provenientes da travessia de comboios de veícul...
During the first live load test in bridges, performed in Costa Ricaon October 05th, 2012 that was ma...
The reliability index ß is a parameter used to estimate the safety of a structure or an element duri...
Apresenta-se uma metodologia de análise com o objetivo de avaliarem-se os efeitos de irregularidades...
As pontes rodoviárias de concreto armado estão sujeitas à ações dinâmicas variáveis devido ao tráfeg...
Durante la realización de la primera prueba de carga viva en puentes a nivel nacional que lideró el ...
The segmental construction process and the existence of two different concretes in the section gives...
[EN] On this document works structural calculation generated by a variation of the CV-190 road passi...
As lajes dos tabuleiros de pontes de concreto armado, sejam elas maciças ou executadas com pré-lajes...
The work presented is part of an investigation project conducted by an inquiry group of new material...
To monitor the structural health of a bridge over its lifetime is necessary to have numerical models...
This thesis presents an approach to evaluate and develop a live load model. Although the main purpos...
The reliability index p is a parameter used to estimate the safety of a structure or an element duri...
O aumento nos limites de pesos estabelecidos pela legislação brasileira e o surgimento de novas comb...
The reliability index p is a parameter used to estimate the safety of a structure or an element duri...
Nesta dissertação são avaliados os efeitos dinâmicos provenientes da travessia de comboios de veícul...
During the first live load test in bridges, performed in Costa Ricaon October 05th, 2012 that was ma...
The reliability index ß is a parameter used to estimate the safety of a structure or an element duri...
Apresenta-se uma metodologia de análise com o objetivo de avaliarem-se os efeitos de irregularidades...
As pontes rodoviárias de concreto armado estão sujeitas à ações dinâmicas variáveis devido ao tráfeg...
Durante la realización de la primera prueba de carga viva en puentes a nivel nacional que lideró el ...
The segmental construction process and the existence of two different concretes in the section gives...
[EN] On this document works structural calculation generated by a variation of the CV-190 road passi...
As lajes dos tabuleiros de pontes de concreto armado, sejam elas maciças ou executadas com pré-lajes...
The work presented is part of an investigation project conducted by an inquiry group of new material...
To monitor the structural health of a bridge over its lifetime is necessary to have numerical models...
This thesis presents an approach to evaluate and develop a live load model. Although the main purpos...