We discuss beam deceleration through a series of 12 power extraction and transfer structures, at the CLIC test facility 3 at CERN, as a proof-of-principle of the CLIC deceleration scheme. Up to 36% of the kinetic energy of an electron drive beam is extracted and converted to 12 GHz rf power. We look at the average and maximum energy loss of the particles, and compare them with simulations performed with the placet tracking code. The measured final energy is also compared to predictions based on the measured beam current and rf power in the structures. In the analysis we make use of the charge distribution form factor, taking into account the bunch length and the bunch phase. Finally, we look at the evolution of the transverse emittance with...
In the Compact Linear Collider (CLIC) a high-current, low-energy beam will be decelerated in a chain...
The CLIC study is based on the so-called two-beam ac-celeration concept and one of the main goals of...
In CLIC, the rf power to accelerate the main beam is produced by decelerating a drive beam. The Test...
The Test Beam Line at the CLIC Test Facility 3 at CERN is a proof-of-principle of the future CLIC de...
In the CLIC two-beam scheme, the main beam is accelerated by rf power provided by energy extraction ...
The Compact Linear Collider (CLIC) is a potential next-generation particle collider, in which electr...
The Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam deceler...
The CLIC Test Facility 3 Test Beam Line is the first prototype for the CLIC drive beam decelerator. ...
Following the discovery of the Higgs-like boson at the Large Hadron Collider, there is demand for pr...
The CLIC Test Facility 3 Test Beam Line is the first proto-type for the CLIC drive beam decelerator....
We discuss X-band rf power production and deceleration in the two-beam test stand of the CLIC test f...
The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasi...
CLIC is an international study of a future multi-TeV electron-positron linear collider, where the en...
The Compact Linear Collider, CLIC is a study for a future linear electron-positron collider based on...
In the Compact Linear Collider (CLIC) a high-current, low-energy beam will be decelerated in a chain...
In the Compact Linear Collider (CLIC) a high-current, low-energy beam will be decelerated in a chain...
The CLIC study is based on the so-called two-beam ac-celeration concept and one of the main goals of...
In CLIC, the rf power to accelerate the main beam is produced by decelerating a drive beam. The Test...
The Test Beam Line at the CLIC Test Facility 3 at CERN is a proof-of-principle of the future CLIC de...
In the CLIC two-beam scheme, the main beam is accelerated by rf power provided by energy extraction ...
The Compact Linear Collider (CLIC) is a potential next-generation particle collider, in which electr...
The Test Beam Line in the CLIC Test Facility 3 is the first prototype of the CLIC drive beam deceler...
The CLIC Test Facility 3 Test Beam Line is the first prototype for the CLIC drive beam decelerator. ...
Following the discovery of the Higgs-like boson at the Large Hadron Collider, there is demand for pr...
The CLIC Test Facility 3 Test Beam Line is the first proto-type for the CLIC drive beam decelerator....
We discuss X-band rf power production and deceleration in the two-beam test stand of the CLIC test f...
The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasi...
CLIC is an international study of a future multi-TeV electron-positron linear collider, where the en...
The Compact Linear Collider, CLIC is a study for a future linear electron-positron collider based on...
In the Compact Linear Collider (CLIC) a high-current, low-energy beam will be decelerated in a chain...
In the Compact Linear Collider (CLIC) a high-current, low-energy beam will be decelerated in a chain...
The CLIC study is based on the so-called two-beam ac-celeration concept and one of the main goals of...
In CLIC, the rf power to accelerate the main beam is produced by decelerating a drive beam. The Test...