The scheduling of steelmaking continuous-casting (SCC) processes is of major importance in iron and steel operations, since it is often a bottleneck in iron and steel production. Optimal scheduling of SCC processes can increase profit, minimize production cost, reduce material and energy consumption, and improve customer satisfaction. Scheduling of SCC processes is challenging, because of its combinatorial nature, complex practical constraints, and strict requirements on material continuity and flow time, as well as the technological requirements to ensure practical feasibility of the resulting scheduling. In this paper, we first develop a novel unit-specific event-based continuous-time mixed-integer linear optimization (MILP) model for thi...