The aim of this paper is to discuss and explain key concepts in new generation Project management software in the construction industry. Building information modeling "BIM" is considered to be one of the major technologies used by construction stakeholders today. New BIM software now adds the time dimension to the traditional three-dimensional modeling, and thus is called 4D BIM. The 4D BIM simulation process adapts each CAD object with its place in the projects schedule and is scalable to projects of almost any size or complexity. This paper surveys four leading 4D BIM programs namely Synchro, Domos/D-studio, Vico 4D Scheduling, and Innovaya 4D Visual Simulation; to see how they address the fundamental question asked by stakeholders in con...
This paper presents time and cost planning in construction projects using building information model...
4D simulation integrates the 3 dimensional model of a building with the construction schedule, and i...
AbstractThe application of Information Technology (IT) to construction project management (CPM) has ...
The architecture, engineering and construction (AEC) industry is shifting from 2D CAD drawings to mo...
2D drawings are commonly being used to present the work process of 3D objects in the construction in...
With the rapid development of the construction industry and computational technology, the digital de...
The integration of construction planning and scheduling into Building Information Modeling (BIM) wor...
Construction planning and scheduling are vital to ensure delivering the project according to the agr...
As project delivery approaches that are supported by Building Information Modelling (BIM) are contin...
Building InformationModelling (BIM) can be defined as a set of tools, processes and technologies tha...
Visualization of construction schedules has much improved through the development of 4D modeling too...
Visualization of construction schedules has much improved through the development of 4D modeling too...
Traditional construction planning and performance control tools such as Gantt Charts and S Curves fa...
Lack of adequate visualization of project construction operations often causes project parties to st...
Construction projects always involve a large number of participants, and managing a vast amount of i...
This paper presents time and cost planning in construction projects using building information model...
4D simulation integrates the 3 dimensional model of a building with the construction schedule, and i...
AbstractThe application of Information Technology (IT) to construction project management (CPM) has ...
The architecture, engineering and construction (AEC) industry is shifting from 2D CAD drawings to mo...
2D drawings are commonly being used to present the work process of 3D objects in the construction in...
With the rapid development of the construction industry and computational technology, the digital de...
The integration of construction planning and scheduling into Building Information Modeling (BIM) wor...
Construction planning and scheduling are vital to ensure delivering the project according to the agr...
As project delivery approaches that are supported by Building Information Modelling (BIM) are contin...
Building InformationModelling (BIM) can be defined as a set of tools, processes and technologies tha...
Visualization of construction schedules has much improved through the development of 4D modeling too...
Visualization of construction schedules has much improved through the development of 4D modeling too...
Traditional construction planning and performance control tools such as Gantt Charts and S Curves fa...
Lack of adequate visualization of project construction operations often causes project parties to st...
Construction projects always involve a large number of participants, and managing a vast amount of i...
This paper presents time and cost planning in construction projects using building information model...
4D simulation integrates the 3 dimensional model of a building with the construction schedule, and i...
AbstractThe application of Information Technology (IT) to construction project management (CPM) has ...