Two designs of experimental combined constructed wetland systems were constructed: vegetated (Scirpus grossus Linn) subsurface horizontal flow bed followed by a vegetated vertical flow bed and a vegetated vertical flow bed over an unvegetated horizontal flow sand bed. The systems were used to compare the nitrification/denitrification efficiency in a tropical climate which has temperatures above an average of 25°C throughout the year. The effluent from a biogas digester of pig farm wastewater with TKN and COD concentrations of approximately 400 and 1,000 mg/L was fed every 4 hours intermittently. The effluent was recycled to the system with the ratio of 1:1 and the hydraulic loading rate was increased from 3 to 6 and 12 cm/d including recycl...
This article reports pollutant removal performances of baffled subsurface flow, and integrated surfa...
This study analyses the performance of a hybrid Free Water surface/Vertical flow (FVS/VF) wetland in...
The study was carried out in 4 concrete beds: two vertical subsurface flow beds (dimension of 1x1.4 ...
Two designs of experimental combined constructed wetland systems were constructed: vegetated (Scirpu...
Pig farm wastewater creates various problems in many areas throughout Thailand. Constructed wetland ...
The present study demonstrates wetland projects to treat industrial wastewater for reuse implemented...
tAn experimental hybrid constructed wetland system consisting of 3 stages of different wetland confi...
Increasing demands for improved water quality in receiving waters, effluent reclamation and reuse ha...
Disposal of wastewater generated by confmed swine production units is a problem when land is limited...
Wastewater treatment has given an immense attention in the field of pollution control throughout the...
Constructed wetlands (CWs) have been successfully used for treating various wastewaters for decades ...
Constructed wetlands (CW) are wastewater treatment systems with low energy consumption, no negative ...
Pilot scale studies were conducted to determine the performance of a subsurface horizontal flow cons...
Non-point source pollution such as land-spreading of nitrogen-rich piggery wastewater poses a signif...
Two pilot-scale integrated vertical-flow constructed wetlands (IVCWs) in parallel were employed to e...
This article reports pollutant removal performances of baffled subsurface flow, and integrated surfa...
This study analyses the performance of a hybrid Free Water surface/Vertical flow (FVS/VF) wetland in...
The study was carried out in 4 concrete beds: two vertical subsurface flow beds (dimension of 1x1.4 ...
Two designs of experimental combined constructed wetland systems were constructed: vegetated (Scirpu...
Pig farm wastewater creates various problems in many areas throughout Thailand. Constructed wetland ...
The present study demonstrates wetland projects to treat industrial wastewater for reuse implemented...
tAn experimental hybrid constructed wetland system consisting of 3 stages of different wetland confi...
Increasing demands for improved water quality in receiving waters, effluent reclamation and reuse ha...
Disposal of wastewater generated by confmed swine production units is a problem when land is limited...
Wastewater treatment has given an immense attention in the field of pollution control throughout the...
Constructed wetlands (CWs) have been successfully used for treating various wastewaters for decades ...
Constructed wetlands (CW) are wastewater treatment systems with low energy consumption, no negative ...
Pilot scale studies were conducted to determine the performance of a subsurface horizontal flow cons...
Non-point source pollution such as land-spreading of nitrogen-rich piggery wastewater poses a signif...
Two pilot-scale integrated vertical-flow constructed wetlands (IVCWs) in parallel were employed to e...
This article reports pollutant removal performances of baffled subsurface flow, and integrated surfa...
This study analyses the performance of a hybrid Free Water surface/Vertical flow (FVS/VF) wetland in...
The study was carried out in 4 concrete beds: two vertical subsurface flow beds (dimension of 1x1.4 ...