<p>The simulated results are represented by the solid symbols connected with lines. In these cases, the x-axis represents the simulated <i>K</i><sub><i>i</i></sub> value while the y-axis is the mean <i>K</i><sub><i>i</i></sub> of the simulation minus the simulated value. Symbols along the line are simulations with the same <i>K</i><sub><i>1</i></sub> and <i>V</i><sub><i>ND</i></sub> but a different <i>k</i><sub><i>3</i></sub>. <i>K</i><sub>1</sub> = 0.16 mL·cm<sup>-3</sup>·min<sup>-1</sup> (Low rCBF), <i>K</i><sub>1</sub> = 0.36 mL·cm<sup>-3</sup>·min<sup>-1</sup> (high rCBF), <i>V</i><sub><i>ND</i></sub> = 2, 4 and 4.5 mL·cm<sup>-3</sup>(Low, High, very high respectively). Scattered points are data from real images (6 subjects/9 ROIs/2 sca...
<p>(A) The simulated and observed <i>N/S</i> ratios with increasing cutoffs of sequencing coverage (...
<p>Percent bias using (A) SV and (B) REP transformations and relative error using (C) SV and (D) REP...
<p>(A) Percent bias, (B) percent relative error, and (C) average <i>k</i> estimate. Early, mid, late...
<p>Each plotted data point represents one million simulations and five such points are plotted for e...
Contour levels for the bias index based on 100 000 simulations of the nonresponse mechanism, for πm...
<p>Simulation study estimates of bias (mean and 95% confidence interval for the mean).</p
<p>A. (<i>n</i><sub>1</sub>,<i>n</i><sub>2</sub>,<i>n</i><sub>3</sub>) = (200,100,100). <b>B</b>. (<...
Each plot shows the bias for 1 relevant variable (rel.) and the 9 irrelevant variables (irr.) within...
Each scatter plot depicts the census (true) availability measure as a red triangle, along with point...
<p>As a reference, we included the approximate voxel noise level of a PET/CT camera (Biograph HiRez ...
<p><b>A.</b> Variation of distributions due to increase in sample sizes (Case I). <b>B.</b> Variatio...
Curve of the bias index based on 1 000 000 simulations of the nonresponse mechanism, for πz = 0.2, ...
<p>The x-axis denotes the absolute level of estimation bias (abs[estimated value – true value]*100) ...
<p>In the simulation, the dispersion is simulated according to an NB2 (left panel) or an NBQ (right ...
<div><p>(A) Difference vectors around each site's mean vector. Black dots, origin of each difference...
<p>(A) The simulated and observed <i>N/S</i> ratios with increasing cutoffs of sequencing coverage (...
<p>Percent bias using (A) SV and (B) REP transformations and relative error using (C) SV and (D) REP...
<p>(A) Percent bias, (B) percent relative error, and (C) average <i>k</i> estimate. Early, mid, late...
<p>Each plotted data point represents one million simulations and five such points are plotted for e...
Contour levels for the bias index based on 100 000 simulations of the nonresponse mechanism, for πm...
<p>Simulation study estimates of bias (mean and 95% confidence interval for the mean).</p
<p>A. (<i>n</i><sub>1</sub>,<i>n</i><sub>2</sub>,<i>n</i><sub>3</sub>) = (200,100,100). <b>B</b>. (<...
Each plot shows the bias for 1 relevant variable (rel.) and the 9 irrelevant variables (irr.) within...
Each scatter plot depicts the census (true) availability measure as a red triangle, along with point...
<p>As a reference, we included the approximate voxel noise level of a PET/CT camera (Biograph HiRez ...
<p><b>A.</b> Variation of distributions due to increase in sample sizes (Case I). <b>B.</b> Variatio...
Curve of the bias index based on 1 000 000 simulations of the nonresponse mechanism, for πz = 0.2, ...
<p>The x-axis denotes the absolute level of estimation bias (abs[estimated value – true value]*100) ...
<p>In the simulation, the dispersion is simulated according to an NB2 (left panel) or an NBQ (right ...
<div><p>(A) Difference vectors around each site's mean vector. Black dots, origin of each difference...
<p>(A) The simulated and observed <i>N/S</i> ratios with increasing cutoffs of sequencing coverage (...
<p>Percent bias using (A) SV and (B) REP transformations and relative error using (C) SV and (D) REP...
<p>(A) Percent bias, (B) percent relative error, and (C) average <i>k</i> estimate. Early, mid, late...