<p>Total working time for the different scenarios and three planning time windows.</p
Project turnaround time: Median time between events in diagnostic cascade, Median (IQR).</p
<p>The total time of access to contacts according to the number of contacts, where one app category ...
The relationship between the time window size and the effectiveness of prediction model.</p
<p>Animal transportation time, total driving time, total distance and total working time for the Bas...
<p>Number of stops along each route for scenarios with seven-day planning time window.</p
<p>Descriptive statistics of time spent on completing the manufacturing task.</p
<p>The execution time of the three methods against different numbers of new data points.</p
Proportion of time spent per average shift by task sub-categories and categories.</p
Estimated time spent in each activity from time and motion and costing instruments.</p
Average time that each container type spends at the LICD in scenarios S1–S5 (hours).</p
The total run time performance per hours of the two pipelines for each sample.</p
<p>The percentage of time spent engaged in each activity type in the two environments.</p
<p>Overall survival time between different chemotherapy treatments in the combination group.</p
<p>Note: Total time interval is the product of time intervals and number of workers. These intervals...
Mean values of different motivation time periods and experimental conditions.</p
Project turnaround time: Median time between events in diagnostic cascade, Median (IQR).</p
<p>The total time of access to contacts according to the number of contacts, where one app category ...
The relationship between the time window size and the effectiveness of prediction model.</p
<p>Animal transportation time, total driving time, total distance and total working time for the Bas...
<p>Number of stops along each route for scenarios with seven-day planning time window.</p
<p>Descriptive statistics of time spent on completing the manufacturing task.</p
<p>The execution time of the three methods against different numbers of new data points.</p
Proportion of time spent per average shift by task sub-categories and categories.</p
Estimated time spent in each activity from time and motion and costing instruments.</p
Average time that each container type spends at the LICD in scenarios S1–S5 (hours).</p
The total run time performance per hours of the two pipelines for each sample.</p
<p>The percentage of time spent engaged in each activity type in the two environments.</p
<p>Overall survival time between different chemotherapy treatments in the combination group.</p
<p>Note: Total time interval is the product of time intervals and number of workers. These intervals...
Mean values of different motivation time periods and experimental conditions.</p
Project turnaround time: Median time between events in diagnostic cascade, Median (IQR).</p
<p>The total time of access to contacts according to the number of contacts, where one app category ...
The relationship between the time window size and the effectiveness of prediction model.</p