Three specimens belonging to failed boiler tube, wash water line and intermediate tube sheet of furnace were forwarded to the laboratory for analysis. Investigation revealed that the boiler tube had failed by stress rupture due to prolonged over heating and the wash water line had failed by sulphide cracking due to sensitization of the stainless steel tube during welding. The fracture surface of the intermediate tube sheet of the furnace was completely destroyed due to corrosion and hence no study could be carried out
The aim of this investigation is to examine the premature failure of a low-pressure steam superheat...
Failures were reported in the waterwall tubes of boiler no.7 of BPSCL, Bokaro. Systematic investigat...
The failure of the boiler tubes occur due to various reasons like creep, fatigue, corrosion and eros...
Three specimens belonging to failed boiler tube, wash water line and intermediate tube sheet of furn...
Leakages were observedfrom the roof tubes on the secondpass of boilers # 6, 7 and 8 of\ud Jeddah Pha...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
A cracked heat exchanger tube was sent to this laboratory for analyzing the cause of failure. Examin...
This paper presents a case study of ASME SA213 type-T22 alloy steel superheater tube that failed in ...
High temperature corrosion of the water wall tube in a 50 MW thermal power plant was investigated wh...
A fractured vent line tube was sent to the laboratory for analysis. The failure of the tube was by ...
A fractured vent line tube was sent to the laboratory for analysis. The failure of the tube was by ...
This paper presents failure investigation on the SA210GrC water wall tube by visual Site inspection,...
Failure investigation was carried out on boiler water wall tubes of a thermal power plant through v...
The failure of industrial boilers has been a prominent feature in fossil fuel fired power plants. ...
The aim of this investigation is to examine the premature failure of a low-pressure steam superheat...
Failures were reported in the waterwall tubes of boiler no.7 of BPSCL, Bokaro. Systematic investigat...
The failure of the boiler tubes occur due to various reasons like creep, fatigue, corrosion and eros...
Three specimens belonging to failed boiler tube, wash water line and intermediate tube sheet of furn...
Leakages were observedfrom the roof tubes on the secondpass of boilers # 6, 7 and 8 of\ud Jeddah Pha...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
A cracked heat exchanger tube was sent to this laboratory for analyzing the cause of failure. Examin...
This paper presents a case study of ASME SA213 type-T22 alloy steel superheater tube that failed in ...
High temperature corrosion of the water wall tube in a 50 MW thermal power plant was investigated wh...
A fractured vent line tube was sent to the laboratory for analysis. The failure of the tube was by ...
A fractured vent line tube was sent to the laboratory for analysis. The failure of the tube was by ...
This paper presents failure investigation on the SA210GrC water wall tube by visual Site inspection,...
Failure investigation was carried out on boiler water wall tubes of a thermal power plant through v...
The failure of industrial boilers has been a prominent feature in fossil fuel fired power plants. ...
The aim of this investigation is to examine the premature failure of a low-pressure steam superheat...
Failures were reported in the waterwall tubes of boiler no.7 of BPSCL, Bokaro. Systematic investigat...
The failure of the boiler tubes occur due to various reasons like creep, fatigue, corrosion and eros...