In recent years, as the finance of the national and local governments becomes severe in Japan. The government construction investment has been decreasing, and now it is reduced by 48.9 percent from its peak. People’s cost consciousness is also rising due to cut in the construction investment. The public works project in Japan is under severe conditions due to the budgetary cutback. Responding to this situational change, the government has started implementing the cost structural reform of public works” used for the whole government in 2003. This reform describes reconsideration of all processes of the public works project from cost viewpoints. However, “the viewpoints from the geological feature” are not specifically described. Geological c...
Thesis (Ph.D.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1984.MICROFICHE C...
Private Finance Initiative (PFI) is a delivery system for public works projects to design construct,...
Ground related problems and conditions can often adversely affect costs, completion time, profitabil...
In mountain tunneling, it is important to avoid or reduce the geological risks such as a weakness of...
In construction of the mountain tunneling in Japan, the accident resulting from face collapse accoun...
ABSTRACT: In construction of the mountain tunneling in Japan, the accident resulting from face colla...
Awarding design-build (DB) contracts before a complete subsurface investigation is completed, makes ...
Geotechnical uncertainty may be the most difficult risk to manage in construction. In design-build (...
Changes during the construction phase generate cost growth, schedule delays, and claims in any proje...
State highways agencies policies and procedures for articulating geotechnical information and requir...
UIDP/GEO/04035/2020In a global society, in which geotechnical projects are increasingly designed in ...
The fact that ground-related problems are a significant contributor to construction project delays a...
The need for adequate geologic input into civil engineering projects is common knowledge to all. How...
A review of publicly funded UK structural and geotechnical research showed it was among the best in ...
Under tighter project environment constraints, project risk management is rapidly becoming a popular...
Thesis (Ph.D.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1984.MICROFICHE C...
Private Finance Initiative (PFI) is a delivery system for public works projects to design construct,...
Ground related problems and conditions can often adversely affect costs, completion time, profitabil...
In mountain tunneling, it is important to avoid or reduce the geological risks such as a weakness of...
In construction of the mountain tunneling in Japan, the accident resulting from face collapse accoun...
ABSTRACT: In construction of the mountain tunneling in Japan, the accident resulting from face colla...
Awarding design-build (DB) contracts before a complete subsurface investigation is completed, makes ...
Geotechnical uncertainty may be the most difficult risk to manage in construction. In design-build (...
Changes during the construction phase generate cost growth, schedule delays, and claims in any proje...
State highways agencies policies and procedures for articulating geotechnical information and requir...
UIDP/GEO/04035/2020In a global society, in which geotechnical projects are increasingly designed in ...
The fact that ground-related problems are a significant contributor to construction project delays a...
The need for adequate geologic input into civil engineering projects is common knowledge to all. How...
A review of publicly funded UK structural and geotechnical research showed it was among the best in ...
Under tighter project environment constraints, project risk management is rapidly becoming a popular...
Thesis (Ph.D.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1984.MICROFICHE C...
Private Finance Initiative (PFI) is a delivery system for public works projects to design construct,...
Ground related problems and conditions can often adversely affect costs, completion time, profitabil...