Abstract The removal of overlying waste rock in open pit mines to dumps is conventionally undertaken by draglines or by trucks and shovels, or by a combination of these. Waste rock dumps are the largest remnant structures of open cut mining operations and can absorb a large proportion of the mine operating costs. If the dumps are not properly developed they can be excessively expensive and can become a major safety risk and environmental hazard. There are many examples worldwide where poor design and construction of waste rock dumps have resulted in failures causing considerable loss of life and widespread damage, or have resulted in erosion and seepage that have led to severe environmental pollution. The proper design and scheduling of was...
In oil sands mining, timely provisions of ore and tailings containment with less environmental footp...
none3siLong-term production scheduling is a major step in open pit mine planning and design. It aims...
This article presents the problem of short-term planning of open-pit mining processes and work shift...
A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface ...
Despite the fact that waste rock hauling and dumping comprises a large proportion of the cost of mat...
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce s...
Cost reduction via optimising the scheduling of waste rock placement has a very high potential of su...
In most surface mining operations, waste rocks are removed from the pit and deposited on adjacent ar...
An open-pit mine schedule defines the optimal sequence of mining valuable (ore) and waste material w...
A mine landform progression plan can provide a clear outlook of the entire mining operation. To prod...
Acid rock drainage (ARD), produced from sulfide-bearing mine waste (e.g., waste rock, tailings) at a...
© The Australasian Institute of Mining and Metallurgy 2018. All rights are reserved. A mine landform...
Modern large-scale open pit mines move hundreds of thousands of tonnes of material daily, from the l...
This research project aims to optimise the long term mine rock dump planning by generating the optim...
In the mining industry, methods to reduce the fuel consumed in the haulage operations are largely so...
In oil sands mining, timely provisions of ore and tailings containment with less environmental footp...
none3siLong-term production scheduling is a major step in open pit mine planning and design. It aims...
This article presents the problem of short-term planning of open-pit mining processes and work shift...
A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface ...
Despite the fact that waste rock hauling and dumping comprises a large proportion of the cost of mat...
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce s...
Cost reduction via optimising the scheduling of waste rock placement has a very high potential of su...
In most surface mining operations, waste rocks are removed from the pit and deposited on adjacent ar...
An open-pit mine schedule defines the optimal sequence of mining valuable (ore) and waste material w...
A mine landform progression plan can provide a clear outlook of the entire mining operation. To prod...
Acid rock drainage (ARD), produced from sulfide-bearing mine waste (e.g., waste rock, tailings) at a...
© The Australasian Institute of Mining and Metallurgy 2018. All rights are reserved. A mine landform...
Modern large-scale open pit mines move hundreds of thousands of tonnes of material daily, from the l...
This research project aims to optimise the long term mine rock dump planning by generating the optim...
In the mining industry, methods to reduce the fuel consumed in the haulage operations are largely so...
In oil sands mining, timely provisions of ore and tailings containment with less environmental footp...
none3siLong-term production scheduling is a major step in open pit mine planning and design. It aims...
This article presents the problem of short-term planning of open-pit mining processes and work shift...