Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the 1960s. The major problem in. the long-term production scheduling for an entire orebody is that the number of integer variables needed to formulate an MIP model is too large to solve the formulation. This number may reach well over one hundred thousand. To overcome this difficulty, this paper presents two new algorithms to reduce the size of the problem. These algorithms assign an earliest and latest possible start date for each machine placement, eliminating the integer variables that correspond to machine placement before its early start date and after its late start date. A case study based on Kiruna Mine, the second largest underground mi...
The open pit mine production scheduling problem (OPMPSP) is a well-known combinatorial optimization ...
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce s...
Many papers have been published by the scientific community on the development of techniques that us...
Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the...
none3siLong-term production scheduling is a major step in open pit mine planning and design. It aims...
© The Australasian Institute of Mining and Metallurgy 2018. All rights are reserved. A mine landform...
In the literature of mining optimisation, most classical mine block sequencing or open-pit mine prod...
Abstract LKAB’s Kiruna mine is an underground sublevel caving mine located above the Arctic circle i...
Maximising value is the main objective when developing long term mine production schedules. These re...
The use of mixed integer programming is a modelling approach well suited to formulate the mine sche...
This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit ...
Mining investment has been recognized as capital intensive due mainly to the cost of large equipment...
LKAB's Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly us...
Pit planning and long-term production scheduling are important tasks within the mining industry. Thi...
Cost reduction via optimising the scheduling of waste rock placement has a very high potential of su...
The open pit mine production scheduling problem (OPMPSP) is a well-known combinatorial optimization ...
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce s...
Many papers have been published by the scientific community on the development of techniques that us...
Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the...
none3siLong-term production scheduling is a major step in open pit mine planning and design. It aims...
© The Australasian Institute of Mining and Metallurgy 2018. All rights are reserved. A mine landform...
In the literature of mining optimisation, most classical mine block sequencing or open-pit mine prod...
Abstract LKAB’s Kiruna mine is an underground sublevel caving mine located above the Arctic circle i...
Maximising value is the main objective when developing long term mine production schedules. These re...
The use of mixed integer programming is a modelling approach well suited to formulate the mine sche...
This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit ...
Mining investment has been recognized as capital intensive due mainly to the cost of large equipment...
LKAB's Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly us...
Pit planning and long-term production scheduling are important tasks within the mining industry. Thi...
Cost reduction via optimising the scheduling of waste rock placement has a very high potential of su...
The open pit mine production scheduling problem (OPMPSP) is a well-known combinatorial optimization ...
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce s...
Many papers have been published by the scientific community on the development of techniques that us...