Purpose– The “multi‐criteria selection” has become popular practice in selecting contractors, especially for public works, which involve multiple stakeholders. In line with this development, contractors need to consider more factors apart from offering a lower bidding price in formulating a bidding strategy. The purpose of this paper is to introduce a quantitative method, namely the fuzzy competence requirement (FCR) model, for assisting a contractor to formulate a better bidding strategy by better utilising its competence for meeting the best multiple criteria imposed by clients.Design/methodology/approach– The fuzzy linear programming with multiple objectives technique is applied in this paper and an illustrative example is introduced to ...
Estimating and bidding a job is one of those essential processes at the heart of a contractor's busi...
Though the construction industry is one of the most dynamic, challenging and rewarding industries, i...
© Springer-Verlag London Limited 2010. To be successful in a multi-attribute auction, agents must be...
This paper designs a novel fuzzy competition and attitude based bidding strategy (FCA-Bid), in which...
Two critical decisions faced by bidders in competitive bidding include, firstly, whether or not to s...
[[abstract]]Many construction markets exhibit severe price competition where contractors have to cut...
In the bidding procedure not only the contractor but also the construction owner make a number of vi...
Contractors realize the importance of making the right decisions during the tendering stage. Failing...
Purpose - This paper aims to provide a solution that allows a contractor to present its maximum comp...
This paper aims to present a combined fuzzy Analytical Hierarchical Process (AHP) and Simple Multi-A...
A general contractor’s ability to select proper subcontractors in foreign projects is a key competit...
Abstract In the construction industry, the selection of contractors is very challenging for both pri...
Estimating and bidding a job is one of those essential processes at the heart of a contractor's busi...
To be successful in Continuous Double Auctions, agents must be capable of adapting to continuously c...
Selecting an appropriate contractor is essential for the success of any construction project. Contr...
Estimating and bidding a job is one of those essential processes at the heart of a contractor's busi...
Though the construction industry is one of the most dynamic, challenging and rewarding industries, i...
© Springer-Verlag London Limited 2010. To be successful in a multi-attribute auction, agents must be...
This paper designs a novel fuzzy competition and attitude based bidding strategy (FCA-Bid), in which...
Two critical decisions faced by bidders in competitive bidding include, firstly, whether or not to s...
[[abstract]]Many construction markets exhibit severe price competition where contractors have to cut...
In the bidding procedure not only the contractor but also the construction owner make a number of vi...
Contractors realize the importance of making the right decisions during the tendering stage. Failing...
Purpose - This paper aims to provide a solution that allows a contractor to present its maximum comp...
This paper aims to present a combined fuzzy Analytical Hierarchical Process (AHP) and Simple Multi-A...
A general contractor’s ability to select proper subcontractors in foreign projects is a key competit...
Abstract In the construction industry, the selection of contractors is very challenging for both pri...
Estimating and bidding a job is one of those essential processes at the heart of a contractor's busi...
To be successful in Continuous Double Auctions, agents must be capable of adapting to continuously c...
Selecting an appropriate contractor is essential for the success of any construction project. Contr...
Estimating and bidding a job is one of those essential processes at the heart of a contractor's busi...
Though the construction industry is one of the most dynamic, challenging and rewarding industries, i...
© Springer-Verlag London Limited 2010. To be successful in a multi-attribute auction, agents must be...