The stability of the permanent shiplock slopes is among the key issues in the design and construction of the Three Gorges Project in China. The unloading process due to excavation has negative effects on the mechanical properties of the rock mass in the slopes. This paper employs both the upper bound limit analysis and a finite element method (2D and 3D) to evaluate the stability of permanent slopes under the effects of excavation. The results from different methods effectively support and complement each other. The calculated factors of safety confirm the adequacy of the geological condition for ensuring overall stability of the slopes. After the excavation, the tensile stress and shear-damaged zones mainly occur at the middle and upper pa...
Hydropower plants (including the switching station) built in the middle and southern section of the ...
The aim of this study is to examine cracking and instability of the high and steep left bank slope w...
The development and application of a new upper limit method for 2D and 3D slope stability problems a...
The stability and deformation of the permanent shiplock slopes are among the key issues in the desig...
Landslide disasters have become one of the main problems after the Three Gorges impounded. Scholars ...
Landslide disasters have become one of the main problems after the Three Gorges impounded. Scholars ...
Landslide disasters have become one of the main problems after the Three Gorges impounded. Scholars ...
This paper presents a case history of the 205 m high intake slope at the Huangjinping (HJP) hyd...
The high-steep rock slope stability is one of the key technologies in the construction of water cons...
AbstractThe construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wa...
The stratified rock of Jurassic strata is widely distributed in Three Gorges Reservoir Region. The l...
Under the condition of the plane strain, finite element limit equilibrium method is used to study so...
AbstractThe construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wa...
The stratified rock of Jurassic strata is widely distributed in Three Gorges Reservoir Region. The l...
To analyze the excavation stability and reasonable reinforcement measures of cutting slope with a go...
Hydropower plants (including the switching station) built in the middle and southern section of the ...
The aim of this study is to examine cracking and instability of the high and steep left bank slope w...
The development and application of a new upper limit method for 2D and 3D slope stability problems a...
The stability and deformation of the permanent shiplock slopes are among the key issues in the desig...
Landslide disasters have become one of the main problems after the Three Gorges impounded. Scholars ...
Landslide disasters have become one of the main problems after the Three Gorges impounded. Scholars ...
Landslide disasters have become one of the main problems after the Three Gorges impounded. Scholars ...
This paper presents a case history of the 205 m high intake slope at the Huangjinping (HJP) hyd...
The high-steep rock slope stability is one of the key technologies in the construction of water cons...
AbstractThe construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wa...
The stratified rock of Jurassic strata is widely distributed in Three Gorges Reservoir Region. The l...
Under the condition of the plane strain, finite element limit equilibrium method is used to study so...
AbstractThe construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wa...
The stratified rock of Jurassic strata is widely distributed in Three Gorges Reservoir Region. The l...
To analyze the excavation stability and reasonable reinforcement measures of cutting slope with a go...
Hydropower plants (including the switching station) built in the middle and southern section of the ...
The aim of this study is to examine cracking and instability of the high and steep left bank slope w...
The development and application of a new upper limit method for 2D and 3D slope stability problems a...