Scania is constantly trying to improve their product development process, the PD-process. The company, along with others, is optimizing their development process in order to gain advantage in terms of shorter lead times and larger market shares. For this to happen, a well organized process is required. The PD-process is divided into three different phases that are linked together by a hand-over procedure. Scania Bus has experienced problems that stem from a lack of hand-over routines, and as a result the product development process has been slowed down. This has a number of consequences, one of them being the complication of new project initiations. The main purpose of this master thesis was to review the hand-over procedure. Within the stu...
Bakgrund: Att hitta effektiva sätt att hantera överlämningar är enligt tidigare studier fortsatt av ...
Fit For Use (FFU) plays an important role in Scania’s mission of providing complete transport soluti...
Detta examensarbete har gjorts under vårterminen 2023 i företaget Scania i Södertälje, Stockholm. Ex...
Syftet med studien är att ge förslag på hur Affärsområde Bostad på Riksbyggen kan förbättra överlämn...
The study aims to study if it is possible to reduce lead time or resource needs by studying the PD p...
The study has been carried out at the spare parts department at Scania AB. The department works with...
Detta examensarbete har genomförts under vårterminen 2016 för högskoleingenjörsprogrammet i innovati...
This report is the result of a master thesis at Linköping University - Institute of Technology and U...
The use of continuous improvement programs is a widespread practice present in many organizations th...
Implementation of common and sustainable working methods is highly valued for Scania IM.The aim of t...
Scania CV AB, Scania Commercial Vehicle Aktiebolag, är ett produktionsföretag som tillverkar och lev...
In the highly competitive transportation industry, one way to gain a competitive advantage is to ens...
In process oriented organizations, it is important to have well-functioning work processes to suppor...
This paper presents the result from a case study at Scania on product development processes. The obj...
Etablerade företag förväntas ha en stark företagskultur för att kunna leverera samma resultat på all...
Bakgrund: Att hitta effektiva sätt att hantera överlämningar är enligt tidigare studier fortsatt av ...
Fit For Use (FFU) plays an important role in Scania’s mission of providing complete transport soluti...
Detta examensarbete har gjorts under vårterminen 2023 i företaget Scania i Södertälje, Stockholm. Ex...
Syftet med studien är att ge förslag på hur Affärsområde Bostad på Riksbyggen kan förbättra överlämn...
The study aims to study if it is possible to reduce lead time or resource needs by studying the PD p...
The study has been carried out at the spare parts department at Scania AB. The department works with...
Detta examensarbete har genomförts under vårterminen 2016 för högskoleingenjörsprogrammet i innovati...
This report is the result of a master thesis at Linköping University - Institute of Technology and U...
The use of continuous improvement programs is a widespread practice present in many organizations th...
Implementation of common and sustainable working methods is highly valued for Scania IM.The aim of t...
Scania CV AB, Scania Commercial Vehicle Aktiebolag, är ett produktionsföretag som tillverkar och lev...
In the highly competitive transportation industry, one way to gain a competitive advantage is to ens...
In process oriented organizations, it is important to have well-functioning work processes to suppor...
This paper presents the result from a case study at Scania on product development processes. The obj...
Etablerade företag förväntas ha en stark företagskultur för att kunna leverera samma resultat på all...
Bakgrund: Att hitta effektiva sätt att hantera överlämningar är enligt tidigare studier fortsatt av ...
Fit For Use (FFU) plays an important role in Scania’s mission of providing complete transport soluti...
Detta examensarbete har gjorts under vårterminen 2023 i företaget Scania i Södertälje, Stockholm. Ex...