This paper provides a business and technical case study for the Continuous Commissioning®(CC®) 1 process developed by the Energy Systems Laboratory (ESL) at Texas A&M University System for building optimization. The business and technical advantages for CC include: 1) project risk mitigation, 2) enhanced occupant comfort and productivity, 3) retrofit identification and 4) a high return on investments [average ROI of 0.5]. ESL applied CC from 2002 to 2004 at Alamo Community College District (ACCD) with conditioned space of 2.35 million square feet, as part of a broader energy efficiency project. The project has produced savings of $510,400 [US]in 23 months with $315,000 from CC alone in first 18 months. The total project cost was $3.5 millio...
Continuous Commissioning (CC®) is an ongoing process to resolve operating problems, improve comfort,...
H&H Report: Continuous Commissioning at Alamo Community College DistrictThis paper presents an overv...
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 build...
This paper provides a business and technical case study for the Continuous Commissioning®(CC®) 1 pro...
This paper presents both the business and the technical case for the Continuous Commissioning (CC) ...
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) a...
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) a...
his paper presents a case study where Continuous Commissioning (CC), a process that optimizes the HV...
Utilization of the Continuous Commissioning® process is presented in the case of the Consolidated Mi...
Continuous Commissioning (CC) is a process that resolves operating problems, optimizes the HVAC syst...
This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin ...
This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin ...
Utilization of the Continuous Commissioning® process is presented in the case of the Consolidated Mi...
Utilization of the Continuous Commissioning® process is presented in the case of the Consolidated Mi...
Continuous Commissioning (CC®) is an ongoing process to resolve operating problems, improve comfort,...
Continuous Commissioning (CC®) is an ongoing process to resolve operating problems, improve comfort,...
H&H Report: Continuous Commissioning at Alamo Community College DistrictThis paper presents an overv...
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 build...
This paper provides a business and technical case study for the Continuous Commissioning®(CC®) 1 pro...
This paper presents both the business and the technical case for the Continuous Commissioning (CC) ...
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) a...
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) a...
his paper presents a case study where Continuous Commissioning (CC), a process that optimizes the HV...
Utilization of the Continuous Commissioning® process is presented in the case of the Consolidated Mi...
Continuous Commissioning (CC) is a process that resolves operating problems, optimizes the HVAC syst...
This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin ...
This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin ...
Utilization of the Continuous Commissioning® process is presented in the case of the Consolidated Mi...
Utilization of the Continuous Commissioning® process is presented in the case of the Consolidated Mi...
Continuous Commissioning (CC®) is an ongoing process to resolve operating problems, improve comfort,...
Continuous Commissioning (CC®) is an ongoing process to resolve operating problems, improve comfort,...
H&H Report: Continuous Commissioning at Alamo Community College DistrictThis paper presents an overv...
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 build...