Railhead is perhaps the highest stressed civil infrastructure due to the passage of heavily loaded wheels through a very small contact patch. The stresses at the contact patch cause yielding of the railhead material and wear. Many theories exist for the prediction of these\ud mechanisms of continuous rails; this process in the discontinuous rails is relatively sparingly researched. Discontinuous railhead edges fail due to accumulating excessive plastic strains. Significant safety concern is widely reported as these edges form part of Insulated\ud Rail Joints (IRJs) in the signalling track circuitry. Since Hertzian contact is not valid at a discontinuous edge, 3D finite element (3DFE) models of wheel contact at a railhead edge have been used...
True stress-strain curve of railhead steel is required to investigate the behaviour of railhead unde...
Railhead becomes severely stressed due to localised contact loadings. This is more critical in the v...
Wheel-rail rolling contact at railhead edge,\ud such as a gap in an insulated rail joint, is a compl...
Railhead is perhaps the highest stressed civil infrastructure due to the passage of heavily loaded w...
Insulated rail joints (IRJs) are very important for signalling systems in controlling trains on a ra...
Insulated rail joints (IRJs) are the most important structural link in a railway track for electrica...
Railhead material becomes severely stressed due to localised cyclical wheel/rail contact loadings. T...
Insulated rail joints (IRJs) are safety critical components in the electrical signalling system of r...
Insulated Rail Joints (IRJs) are designed to electrically isolate two rails in rail tracks to contro...
A detailed finite element analysis (FEA) was carried out to present a stress analysis of an insulate...
This paper presents a validated model of plastic strain accumulation in railway rail steel under rep...
Railhead material becomes severely stressed due to localised wheel/rail contact loadings. The stress...
Free ends of insulated rail joints (IRJs) occur because gaps between the rails and endposts can be c...
Transfer of the load from the wheels on the rail occurs at a very small area compared with the size ...
Insulated rail joints (IRJs) are safety critical components in the electrical signalling system of r...
True stress-strain curve of railhead steel is required to investigate the behaviour of railhead unde...
Railhead becomes severely stressed due to localised contact loadings. This is more critical in the v...
Wheel-rail rolling contact at railhead edge,\ud such as a gap in an insulated rail joint, is a compl...
Railhead is perhaps the highest stressed civil infrastructure due to the passage of heavily loaded w...
Insulated rail joints (IRJs) are very important for signalling systems in controlling trains on a ra...
Insulated rail joints (IRJs) are the most important structural link in a railway track for electrica...
Railhead material becomes severely stressed due to localised cyclical wheel/rail contact loadings. T...
Insulated rail joints (IRJs) are safety critical components in the electrical signalling system of r...
Insulated Rail Joints (IRJs) are designed to electrically isolate two rails in rail tracks to contro...
A detailed finite element analysis (FEA) was carried out to present a stress analysis of an insulate...
This paper presents a validated model of plastic strain accumulation in railway rail steel under rep...
Railhead material becomes severely stressed due to localised wheel/rail contact loadings. The stress...
Free ends of insulated rail joints (IRJs) occur because gaps between the rails and endposts can be c...
Transfer of the load from the wheels on the rail occurs at a very small area compared with the size ...
Insulated rail joints (IRJs) are safety critical components in the electrical signalling system of r...
True stress-strain curve of railhead steel is required to investigate the behaviour of railhead unde...
Railhead becomes severely stressed due to localised contact loadings. This is more critical in the v...
Wheel-rail rolling contact at railhead edge,\ud such as a gap in an insulated rail joint, is a compl...