Some of the most innovative engineering design on the first section of the £5·2 billion Channel Tunnel Rail Link related to groundworks—ranging from dynamic analysis of trackbeds and pile slabs to dry soil mixing techniques and 3D groundwater modelling. This paper provides a brief overview of the geotechnical engineering work on section 1 and explains how the need to reduce design risk to a minimum resulted in valuable new industry guidance
Australia relies heavily on rail for the transportation of bulk commodities and passenger services, ...
Several high speed and extension railway lines are under construction or in planning progress in Ger...
The complexity and the unknowns of the geology at Farringdon, primarily associated with the Lambeth ...
The 53m deep, 1.2m thick, heavily reinforced diaphragm wall, constructed to form this vent shaft, wo...
AbstractThe Edinburgh Glasgow Improvement Programme (EGIP) is a major part of railway investment in ...
The Ulan Line is part of Australian Rail Track Corporation’s Hunter Valley Corridor. It extends appr...
Earthworks are the embankments and cuttings that allow a railway to maintain a certain line, level a...
The transportation infrastructure in coastal regions of Australia has been expanded in recent years ...
New developments in both the theory and the practice of tunnelling are covered in the lecture. The i...
1983Techncial report; Aug 1979-Jan 1982PDFTech ReportUMTA-MA-06-0100-82-2DOT-TSC-UMTA-82-54-2DOT-TSC...
The transportation infrastructure in coastal regions of Australia has been expanded in recent years ...
Volpe National Transportation Systems Center, Technical Reference Centerhttps://doi.org/10.21949/152...
Given the increasing demand for trains to carry heavier loads, current Australian ballasted rail net...
The Central Corridor Grade Separation project involves elevating high-use at-grade railroad tracks t...
This paper presents some of the geotechnical aspects of underground railway construction in the urba...
Australia relies heavily on rail for the transportation of bulk commodities and passenger services, ...
Several high speed and extension railway lines are under construction or in planning progress in Ger...
The complexity and the unknowns of the geology at Farringdon, primarily associated with the Lambeth ...
The 53m deep, 1.2m thick, heavily reinforced diaphragm wall, constructed to form this vent shaft, wo...
AbstractThe Edinburgh Glasgow Improvement Programme (EGIP) is a major part of railway investment in ...
The Ulan Line is part of Australian Rail Track Corporation’s Hunter Valley Corridor. It extends appr...
Earthworks are the embankments and cuttings that allow a railway to maintain a certain line, level a...
The transportation infrastructure in coastal regions of Australia has been expanded in recent years ...
New developments in both the theory and the practice of tunnelling are covered in the lecture. The i...
1983Techncial report; Aug 1979-Jan 1982PDFTech ReportUMTA-MA-06-0100-82-2DOT-TSC-UMTA-82-54-2DOT-TSC...
The transportation infrastructure in coastal regions of Australia has been expanded in recent years ...
Volpe National Transportation Systems Center, Technical Reference Centerhttps://doi.org/10.21949/152...
Given the increasing demand for trains to carry heavier loads, current Australian ballasted rail net...
The Central Corridor Grade Separation project involves elevating high-use at-grade railroad tracks t...
This paper presents some of the geotechnical aspects of underground railway construction in the urba...
Australia relies heavily on rail for the transportation of bulk commodities and passenger services, ...
Several high speed and extension railway lines are under construction or in planning progress in Ger...
The complexity and the unknowns of the geology at Farringdon, primarily associated with the Lambeth ...