Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery entry is developed at the longwall stop position and supported ahead of time so that the required combinations of standing and internal supports can be installed before the longwall face approaches. A calibrated three-dimensional finite element model, developed in conjunction with an underground test area, provided the critical components and design principals for a comprehensive parametric study. The study indicates that vertical, horizontal, and shear stresses concentrated on the outby abutment pillar corner of the recovery room resulting in...
Longwall (LW) salvage and relocation operations are a high-pressure period for all mine personnel, w...
Western mines have had limited choices for standing support. Wood cribs were often too soft and uns...
Longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by...
Pre-driven longwall recovery rooms can be used to safely recover longwall equipment from the current...
A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal...
Pre-driven recovery rooms are used extensively for the removal of mining equipment and hydraulic sup...
Longwall mines typically use some form of standing support for secondary roof support in longwall ta...
The design of longwall gateroad roof support for roadway development and panel extraction has typica...
The rock pressure appearance of longwall faces in shallow seams is generally violent, and roofs and ...
Safety is the most important aspect to the mining industry. Research having a direct and positive i...
Many longwall coordinators are examining the use of pre-driven recovery roadways. This method, if pe...
Submitted by generalized experience entry longwall into pre- driven recovery room (PDRR) in foreign ...
For the purposes of production and safety, the roof exposed in the working area of a longwall face m...
Pumpable roof supports provide an alternative approach to secondary support in underground mining. U...
The era of the shield-supported longwall face began in the United States a little over 25 years ago....
Longwall (LW) salvage and relocation operations are a high-pressure period for all mine personnel, w...
Western mines have had limited choices for standing support. Wood cribs were often too soft and uns...
Longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by...
Pre-driven longwall recovery rooms can be used to safely recover longwall equipment from the current...
A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal...
Pre-driven recovery rooms are used extensively for the removal of mining equipment and hydraulic sup...
Longwall mines typically use some form of standing support for secondary roof support in longwall ta...
The design of longwall gateroad roof support for roadway development and panel extraction has typica...
The rock pressure appearance of longwall faces in shallow seams is generally violent, and roofs and ...
Safety is the most important aspect to the mining industry. Research having a direct and positive i...
Many longwall coordinators are examining the use of pre-driven recovery roadways. This method, if pe...
Submitted by generalized experience entry longwall into pre- driven recovery room (PDRR) in foreign ...
For the purposes of production and safety, the roof exposed in the working area of a longwall face m...
Pumpable roof supports provide an alternative approach to secondary support in underground mining. U...
The era of the shield-supported longwall face began in the United States a little over 25 years ago....
Longwall (LW) salvage and relocation operations are a high-pressure period for all mine personnel, w...
Western mines have had limited choices for standing support. Wood cribs were often too soft and uns...
Longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by...