The search for an improved mechanised method of maintaining railway track to the correct level and alignment led to the development of the stoneblower, a machine that lifts the rail and attached sleepers and pneumatically injects the required amount of 20mm stone into the void created, creating a two-layer granular foundation. Stoneblowing minimises disturbance to the existing well-compacted ballast and reduces the amount of particle breakage normally associated with maintenance. By 1999 a fleet of stoneblowers was fully operational across the UK rail network and achieving target rates of track maintenance. However in some cases the track quality appears to have been left in worse condition than it was pre-maintenance. To investigate the de...
Repeated train loads produce settlements in railway tracks, particularly in ballasted trail tracks. ...
Across the world, ballasted railway tracks are utilised extensively due to their cost efficiency, ea...
Rail tracks are often placed on ballast that is intended to provide a free draining and sound load b...
The search for an improved mechanised method of maintaining railway track to the correct level and a...
New railway track is laid to a specified level and alignment. However, with time and trafficking mo...
Rail tracks are often placed on ballast which offers the desirable resiliency to cyclic loads. Howev...
The operational cost of ballasted railway lines can be reduced by improving track-bed longevity. To...
The ballast layer is the most important component of the railway track infrastructure. It is subject...
In recent times the increase in axle loads and train speeds have posed serious geotechnical issues w...
Ballast plays a vital role in transmitting and distributing train wheel loads to the underlying sub-...
This work is a comprehensive investigation to find to what extent simple laboratory tests e.g. Los A...
Despite its many advantages, ballasted track needs frequent maintenance to ensure an adequate qualit...
Maintenance and eventual renewal of a ballasted track constitute major operational costs for a railw...
Since it is difficult to conduct railway ballast testing in-situ, it is important to simulate the co...
With the upcoming construction of High Speed Rail 2, (London to the ‘North’) a number of issues surr...
Repeated train loads produce settlements in railway tracks, particularly in ballasted trail tracks. ...
Across the world, ballasted railway tracks are utilised extensively due to their cost efficiency, ea...
Rail tracks are often placed on ballast that is intended to provide a free draining and sound load b...
The search for an improved mechanised method of maintaining railway track to the correct level and a...
New railway track is laid to a specified level and alignment. However, with time and trafficking mo...
Rail tracks are often placed on ballast which offers the desirable resiliency to cyclic loads. Howev...
The operational cost of ballasted railway lines can be reduced by improving track-bed longevity. To...
The ballast layer is the most important component of the railway track infrastructure. It is subject...
In recent times the increase in axle loads and train speeds have posed serious geotechnical issues w...
Ballast plays a vital role in transmitting and distributing train wheel loads to the underlying sub-...
This work is a comprehensive investigation to find to what extent simple laboratory tests e.g. Los A...
Despite its many advantages, ballasted track needs frequent maintenance to ensure an adequate qualit...
Maintenance and eventual renewal of a ballasted track constitute major operational costs for a railw...
Since it is difficult to conduct railway ballast testing in-situ, it is important to simulate the co...
With the upcoming construction of High Speed Rail 2, (London to the ‘North’) a number of issues surr...
Repeated train loads produce settlements in railway tracks, particularly in ballasted trail tracks. ...
Across the world, ballasted railway tracks are utilised extensively due to their cost efficiency, ea...
Rail tracks are often placed on ballast that is intended to provide a free draining and sound load b...