This paper presents the formulations of the expected long-run cost per time unit for a system monitored by a static control chart and by an adaptive control chart respectively. The static chart has a fixed sampling interval and a fixed sample size. The adaptive chart has a fixed sample size but variable sampling intervals. The system is supposed to have three states, normal working state, failure delay time state, and failed state. Two levels of repair are used to maintain the system. A minor repair is used to restore the system if a detectable defect is confirmed by an inspection. A major repair will be performed if the system fails. The expected cost per time unit for maintaining such a system is obtained. The objective of such a...