Deterministic design methods are commonly used to determine preliminary breakwater designs. Partial safety factors take into account previous experiences and provide a robust preliminary design. However, local circumstances can prove to differ considerably compared to average design conditions and stochastic variations in breakwater strength parameters are commonly neglected. With new armouring techniques, such as Core-loc armouring, the uncertainties about the armour strength are relatively large. Design guidelines include a safety factor, but often an additional safety margin is applied in the final design of the armouring to ensure stability. This can result in structure strengths more, or less, than locally required. The economic optimu...
The paper presents results from numerical simulations performed with the objective of identifying op...
Breakwaters can be divided into two maintypes: the classic (rubblemound) type breakwater and the ver...
In 2006 a Vietnamese Engineering Consultancy Company carried out a design study of a Naval Base at t...
One of the failure mechanisms of a rubble mound breakwater is the failure of its armour layer. In or...
One of the failure mechanisms of a rubble mound breakwater is the failure of its armour layer. In or...
Breakwaters differ from each other by their functions or their type. The most important function of ...
All over the world rubble mound breakwaters are built to protect harbours, shorelines, and other vul...
From the ten breakwaters we selected, on the amount of reliable information available, one breakwate...
Optimum design safety levels for rock and cube armoured rubble mound breakwaters without superstruct...
Nowadays the most important sectors in the strategy for the future of the port of Rotterdam are cont...
This paper presents the development of a semi-probabilistic method for armour layer design of rubble...
The breakwaters are designed by considering the cost optimization because a human risk is seldom con...
The present work aims at presenting an approach on implementing appropriate mitigation measures for ...
In 2006 a Vietnamese Engineering Consultancy Company carried out a design study of a Naval Base at t...
In Europe the interest in and the importance of vertical breakwaters is growing. A central point is ...
The paper presents results from numerical simulations performed with the objective of identifying op...
Breakwaters can be divided into two maintypes: the classic (rubblemound) type breakwater and the ver...
In 2006 a Vietnamese Engineering Consultancy Company carried out a design study of a Naval Base at t...
One of the failure mechanisms of a rubble mound breakwater is the failure of its armour layer. In or...
One of the failure mechanisms of a rubble mound breakwater is the failure of its armour layer. In or...
Breakwaters differ from each other by their functions or their type. The most important function of ...
All over the world rubble mound breakwaters are built to protect harbours, shorelines, and other vul...
From the ten breakwaters we selected, on the amount of reliable information available, one breakwate...
Optimum design safety levels for rock and cube armoured rubble mound breakwaters without superstruct...
Nowadays the most important sectors in the strategy for the future of the port of Rotterdam are cont...
This paper presents the development of a semi-probabilistic method for armour layer design of rubble...
The breakwaters are designed by considering the cost optimization because a human risk is seldom con...
The present work aims at presenting an approach on implementing appropriate mitigation measures for ...
In 2006 a Vietnamese Engineering Consultancy Company carried out a design study of a Naval Base at t...
In Europe the interest in and the importance of vertical breakwaters is growing. A central point is ...
The paper presents results from numerical simulations performed with the objective of identifying op...
Breakwaters can be divided into two maintypes: the classic (rubblemound) type breakwater and the ver...
In 2006 a Vietnamese Engineering Consultancy Company carried out a design study of a Naval Base at t...