The Lower Yellowstone Irrigation District diverts up to 1400 cfs into its main canal system on the lower Yellowstone River in Northeastern Montana. In late 2010, as part of a pallid sturgeon recovery program, the USBR and USACE began construction of a new state-of-the-art screened canal head works structure. After over 100 years of unscreened operations, the new fish screened facility was opened in spring 2012. The head works will be integrated into a major river gradient fish passage facility being proposed for construction soon. When completed, the new passage and protection facilities will reduce fish entrainment and open an additional 165 miles of river habitat for the endangered and native fishes. The new headwork facility’s fish prote...
Designing and installing fish screens on irrigation, hydropower, municipal water supplies, and indus...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...
A three year collaborative design process involving USFS, NOAA/NMFS, ODFW, DEQ, USFWS, Three Sisters...
A three year collaborative design process involving USFS, NOAA/NMFS, ODFW, DEQ, USFWS, Three Sisters...
The Lower Yellowstone Irrigation Project near Glendive, MT, has supplied irrigation water for approx...
Civil structures built on the banks of rivers may replace natural riparian habitat with vertical con...
The Red Bluff Fish Passage Improvement Project was a joint design and construction managment effort ...
The Red Bluff Fish Passage Improvement Project was a joint design and construction managment effort ...
Screening water diversions located on natural channels is and important link in sustaining a native ...
The U.S. Army Corps of Engineers (USACE) identified a need for a small-scale, portable floating fish...
Many anadromous fish species, such as Pacific and Atlantic salmon (Onchorhynchus spp., Salmo salar),...
The Hartland Diversion Dam, constructed in the late 19th century, has not only been a barrier for mi...
Truckee Meadows Water Authority’s Glendale Water Supply Improvement Project was needed primarily to ...
Throughout the Pacific Northwest region there is a renewed effort to provide upstream and downstream...
Designing and installing fish screens on irrigation, hydropower, municipal water supplies, and indus...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...
A three year collaborative design process involving USFS, NOAA/NMFS, ODFW, DEQ, USFWS, Three Sisters...
A three year collaborative design process involving USFS, NOAA/NMFS, ODFW, DEQ, USFWS, Three Sisters...
The Lower Yellowstone Irrigation Project near Glendive, MT, has supplied irrigation water for approx...
Civil structures built on the banks of rivers may replace natural riparian habitat with vertical con...
The Red Bluff Fish Passage Improvement Project was a joint design and construction managment effort ...
The Red Bluff Fish Passage Improvement Project was a joint design and construction managment effort ...
Screening water diversions located on natural channels is and important link in sustaining a native ...
The U.S. Army Corps of Engineers (USACE) identified a need for a small-scale, portable floating fish...
Many anadromous fish species, such as Pacific and Atlantic salmon (Onchorhynchus spp., Salmo salar),...
The Hartland Diversion Dam, constructed in the late 19th century, has not only been a barrier for mi...
Truckee Meadows Water Authority’s Glendale Water Supply Improvement Project was needed primarily to ...
Throughout the Pacific Northwest region there is a renewed effort to provide upstream and downstream...
Designing and installing fish screens on irrigation, hydropower, municipal water supplies, and indus...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...