From preface: This monograph presents a detailed description of the results of an ecological study, 1965-1973, of the effects of the warm-water effluent from the Connecticut Yankee Atomic Power Company\u27s electric generating plant at Haddam Neck on the lower reaches of the Connecticut River, USA; it is accompanied in the Introduction by summary recitals of associated research projects and monitoring programs - microbiology, impingement of fish on the intake screens of the plant, and environmental radiation. The study, which embodies hydrography, the benthos, and the resident and anadromous fishes, is characterized by the fact that it was begun while the plant was still in the early stages of construction and that the field work was only t...
"Grant no. R803971.""Study was conducted in cooperation with Wisconsin Power and Light Company, Madi...
Impingement of fish at cooling-water intakes of 20 power plants located on the Great Lakes has been ...
i, 115 p. : map ; 28 cm.Cover title."Under contract with American Electric Power Service Corporation...
From preface: This monograph presents a detailed description of the results of an ecological study, ...
ii, 57 p. : ill. ; 28 cm.Cover title."Under contract with American Electric Power Service Corporatio...
The thermal effects of the nuclear power plant at Monticello, Minnesota were assessed by comparing p...
Beginning in Hay of 1969 field surveys have been conducted in the Hog Island area of the James River...
This report includes the period from January through December 1972. It is the fifth annual report to...
The Oyster Creek Nuclear Generating Station (OCNGS), operated by GPU Nuclear (GPUN) and owned by Jer...
Under contract with Commonwealth Edison Company, the Illinois Natural History Survey studied this co...
This study was performed in Neka Power Plant during one year and started in March 1991, to survey on...
"This report summarizes the progress of studies conducted in 1973 to determine the effects on Hudson...
"This report summarizes the progress of studies conducted in 1971 and 1972 to determine the effects ...
Plume entrainment studies at Vepco Nuclear Power Plant located near Surry, Virginia were initiated i...
The Surry Power Station discharges cooling water into the transition zone of the James River. Phytop...
"Grant no. R803971.""Study was conducted in cooperation with Wisconsin Power and Light Company, Madi...
Impingement of fish at cooling-water intakes of 20 power plants located on the Great Lakes has been ...
i, 115 p. : map ; 28 cm.Cover title."Under contract with American Electric Power Service Corporation...
From preface: This monograph presents a detailed description of the results of an ecological study, ...
ii, 57 p. : ill. ; 28 cm.Cover title."Under contract with American Electric Power Service Corporatio...
The thermal effects of the nuclear power plant at Monticello, Minnesota were assessed by comparing p...
Beginning in Hay of 1969 field surveys have been conducted in the Hog Island area of the James River...
This report includes the period from January through December 1972. It is the fifth annual report to...
The Oyster Creek Nuclear Generating Station (OCNGS), operated by GPU Nuclear (GPUN) and owned by Jer...
Under contract with Commonwealth Edison Company, the Illinois Natural History Survey studied this co...
This study was performed in Neka Power Plant during one year and started in March 1991, to survey on...
"This report summarizes the progress of studies conducted in 1973 to determine the effects on Hudson...
"This report summarizes the progress of studies conducted in 1971 and 1972 to determine the effects ...
Plume entrainment studies at Vepco Nuclear Power Plant located near Surry, Virginia were initiated i...
The Surry Power Station discharges cooling water into the transition zone of the James River. Phytop...
"Grant no. R803971.""Study was conducted in cooperation with Wisconsin Power and Light Company, Madi...
Impingement of fish at cooling-water intakes of 20 power plants located on the Great Lakes has been ...
i, 115 p. : map ; 28 cm.Cover title."Under contract with American Electric Power Service Corporation...