peer reviewedNowadays, shipyards are making every effort to efficiently manage equipments and resources such as labourers, gantry cranes, transporters, steel and block stock yards, etc. The block erection scheduling of a gantry crane has thus far been manually performed by a manager of a shipyard. Such a scenario leads to undesirably long times for producing scheduling results. In addition, the quality of the scheduling results may not be optimal. To improve the overall process, block erection discrete event simulations have been developed in this study by using techniques of optimization. The first results presented in this paper are promising even if some future work must be realized
A master thesis within mechanical engineering performed by two student has been conducted at Scania ...
This study provides heuristic approaches, including an ant colony optimization (ACO) inspired heuris...
The purpose of this project is to evaluate how Discrete-Event Simulation (DES) can be used as a dec...
Nowadays, shipyards are making every effort to efficiently manage equipments and resources such as l...
peer reviewedNowadays, shipyards are making huge effort to efficiently manage equipments and resourc...
The load of resources in the block logistics process influences the mid-term planning and scheduling...
Accurately predicting the required spatial resource for aggregate block assembly in shipyard product...
peer reviewedThis paper presents new developments to link OptiView and a Discrete Event production S...
10.1080/00207543.2011.639816International Journal of Production Research50205986-6004IJPR
European shipyards are building increasing amounts of complex ships such as off-shore, dredging or n...
To improve the efficiency of loading operation by researching the optimization of the pre-marshallin...
The construction industry is considered to be one of the least digitized industries and it is charac...
This paper proposes a simulation optimization based solution approach for the integrated Berth Alloc...
peer reviewedThis study concerns the simulation of a shipbuilding workshop, and its optimization to ...
Currently, in shipbuilding as well as in civil engineering outfitting planning is not sufficiently i...
A master thesis within mechanical engineering performed by two student has been conducted at Scania ...
This study provides heuristic approaches, including an ant colony optimization (ACO) inspired heuris...
The purpose of this project is to evaluate how Discrete-Event Simulation (DES) can be used as a dec...
Nowadays, shipyards are making every effort to efficiently manage equipments and resources such as l...
peer reviewedNowadays, shipyards are making huge effort to efficiently manage equipments and resourc...
The load of resources in the block logistics process influences the mid-term planning and scheduling...
Accurately predicting the required spatial resource for aggregate block assembly in shipyard product...
peer reviewedThis paper presents new developments to link OptiView and a Discrete Event production S...
10.1080/00207543.2011.639816International Journal of Production Research50205986-6004IJPR
European shipyards are building increasing amounts of complex ships such as off-shore, dredging or n...
To improve the efficiency of loading operation by researching the optimization of the pre-marshallin...
The construction industry is considered to be one of the least digitized industries and it is charac...
This paper proposes a simulation optimization based solution approach for the integrated Berth Alloc...
peer reviewedThis study concerns the simulation of a shipbuilding workshop, and its optimization to ...
Currently, in shipbuilding as well as in civil engineering outfitting planning is not sufficiently i...
A master thesis within mechanical engineering performed by two student has been conducted at Scania ...
This study provides heuristic approaches, including an ant colony optimization (ACO) inspired heuris...
The purpose of this project is to evaluate how Discrete-Event Simulation (DES) can be used as a dec...