What should System Managers prefer? Systems that never fail or systems that remain safe during a failure? The present paper tries to give an answer to this dilemma by presenting a methodology that hierarchically analyses the possible preventive maintenance actions in a water system. The whole attempt is based on appropriate indices that assess the performance level of the system, before any action is taken. This is accomplished through a technico-economical analysis that takes into account all kinds of costs referring to the repair or replacement of trouble-causing parts of the system. The methodology can be implemented to any kind of system (e.g. waterworks infrastructure concerning surface or groundwater resources). The present paper deal...
Performance assessment of WDS has been extensively reported in the research and practice literature....
With a large percentage of countries' total infrastructure expenditure attributed to water network m...
Abstract: Approximately 50% of water pumped through distribution systems by the company under study ...
Must the water networks be fail-proof or must they remain safe during a failure? What must water sys...
Water supply and distribution infrastructures are vital for current life. They have a significant ro...
Making decisions on the renewal of a water distribution system is essentially a balancing act betwee...
A water distribution system (WDS) is designed and managed to provide a reliable water supply, that i...
The essence of infrastructure asset management and decision-making on its renewal/ rehabilitation is...
The paper proposes a new methodology for analysing and computing the overall performance of water di...
International audienceWater utilities render a public service that highly influences sensitive domai...
In general, the problem of reliability of water supply covers a wide range of issues related to ensu...
The quest for a characterization of water distribution systems in relation to water losses has led ...
Water distribution systems are aging and deteriorating over time. Deterioration of water mains cause...
In general, the problem of reliability of water supply covers a wide range of issues related to ensu...
In the present study specific performance indicators are proposed in order to express the level of s...
Performance assessment of WDS has been extensively reported in the research and practice literature....
With a large percentage of countries' total infrastructure expenditure attributed to water network m...
Abstract: Approximately 50% of water pumped through distribution systems by the company under study ...
Must the water networks be fail-proof or must they remain safe during a failure? What must water sys...
Water supply and distribution infrastructures are vital for current life. They have a significant ro...
Making decisions on the renewal of a water distribution system is essentially a balancing act betwee...
A water distribution system (WDS) is designed and managed to provide a reliable water supply, that i...
The essence of infrastructure asset management and decision-making on its renewal/ rehabilitation is...
The paper proposes a new methodology for analysing and computing the overall performance of water di...
International audienceWater utilities render a public service that highly influences sensitive domai...
In general, the problem of reliability of water supply covers a wide range of issues related to ensu...
The quest for a characterization of water distribution systems in relation to water losses has led ...
Water distribution systems are aging and deteriorating over time. Deterioration of water mains cause...
In general, the problem of reliability of water supply covers a wide range of issues related to ensu...
In the present study specific performance indicators are proposed in order to express the level of s...
Performance assessment of WDS has been extensively reported in the research and practice literature....
With a large percentage of countries' total infrastructure expenditure attributed to water network m...
Abstract: Approximately 50% of water pumped through distribution systems by the company under study ...