Membrane aeration represents between 35 and 50% of the operational cost of membrane bioreactors (MBR). New automatic control systems and/or module configurations have been developed for aeration optimization. In this paper, we briefly describe an innovative MBR air scour control system based on permeability evolution and present the results of a full-scale validation that lasted over a 1-year period. An average reduction in the air scour flow rate of 13% was achieved, limiting the maximum reduction to 20%. This averaged reduction corresponded to a decrease in energy consumption for membrane aeration of 14% (0.025kWhm<sup>-3</sup>) with maximum saving rates of 22% (0.04kWhm<sup>-3</sup>). Permeability and fouling rate evolution were not affe...
When used to treat municipal wastewater, membrane bioreactors (MBR) attain excellent water quality a...
Membrane bioreactors (MBRs) present a unique opportunity in waste water treatment by combining the a...
A pilot-scale aerobic membrane bioreactor (MBR) was operated for 6.5 months, alongside a full-sized ...
The thesis involves the development and implementation of a new and robust control system based o...
Objectives:MBR (Membrane BioReactor) is well established wastewater treatment that combines biologic...
This paper describes a model-based method to optimise filtration in submerged AnMBRs. The method is ...
Membrane fouling represents one of the major limiting issue for membrane bioreactor (MBR) in the was...
Continual aeration, a fouling control strategy that causes high energy consumption, is the major obs...
In this study different scenarios were scrutinized to minimize the energy consumption of a membrane ...
Membrane fouling represents one of the major crucial issues for membrane bioreactor (MBR). Membrane ...
Despite the high number of advantages of membrane bioreactors (MBR), operational costs still remain ...
The main aim of this study was to develop an advanced controller to optimise filtration in submerged...
Membrane fouling represents one of the major issues for a membrane bioreactor (MBR). Membrane foulin...
Optimising aeration is required to reduce the energy costs of activated sludge wastewater treatment ...
A size (volume) reduction for membrane bioreactor systems (MBR)s is constrained by the maximum amoun...
When used to treat municipal wastewater, membrane bioreactors (MBR) attain excellent water quality a...
Membrane bioreactors (MBRs) present a unique opportunity in waste water treatment by combining the a...
A pilot-scale aerobic membrane bioreactor (MBR) was operated for 6.5 months, alongside a full-sized ...
The thesis involves the development and implementation of a new and robust control system based o...
Objectives:MBR (Membrane BioReactor) is well established wastewater treatment that combines biologic...
This paper describes a model-based method to optimise filtration in submerged AnMBRs. The method is ...
Membrane fouling represents one of the major limiting issue for membrane bioreactor (MBR) in the was...
Continual aeration, a fouling control strategy that causes high energy consumption, is the major obs...
In this study different scenarios were scrutinized to minimize the energy consumption of a membrane ...
Membrane fouling represents one of the major crucial issues for membrane bioreactor (MBR). Membrane ...
Despite the high number of advantages of membrane bioreactors (MBR), operational costs still remain ...
The main aim of this study was to develop an advanced controller to optimise filtration in submerged...
Membrane fouling represents one of the major issues for a membrane bioreactor (MBR). Membrane foulin...
Optimising aeration is required to reduce the energy costs of activated sludge wastewater treatment ...
A size (volume) reduction for membrane bioreactor systems (MBR)s is constrained by the maximum amoun...
When used to treat municipal wastewater, membrane bioreactors (MBR) attain excellent water quality a...
Membrane bioreactors (MBRs) present a unique opportunity in waste water treatment by combining the a...
A pilot-scale aerobic membrane bioreactor (MBR) was operated for 6.5 months, alongside a full-sized ...