Sometimes a complex combinatorial problem has easily identifiable subproblems for which methods are available. Often, strong interactions between these subproblems prevent us to use these methods in a straightforward way. In railway industry, finding a schedule for train service and shunting tasks is an example of such a problem with clearly identifiable, interacting subproblems: Trains with given length have to be parked on a track (BinPacking), a route to that track has to exist (Motion Planning), leaving trains need to be composed of multiple train units of arrived trains (SetCover) and service tasks have to be performed to trains (RCPSP). In practice, we often see that humans tend to split such a problem and solve it sequentially, e.g. ...
Abstract. We consider the situation of rearranging freight trains in a shunting yard with a hump and...
Due to growing demand of sustainable transport, the number of passengers carried by railways is incr...
A train platforming problem (TPP) involves assigning platforms and routes to trains according to the...
A locomotive assignment is one of the subproblems in railway scheduling domain. In this report prese...
When not in use, trains are stored at shunting yards, where they may need servicing. Planning for wh...
Trains’ movements on a railway network are regulated by official timetables. Deviations and delays o...
With few exceptions, train movements are still controlled by human operators, the dispatchers. They ...
The locomotive scheduling problem (or the locomotive assignment problem) is to assign a consist (a ...
The Train Unit Shunting and Servicing (TUSS) problem is an NP-hard problem encountered by the Dutch ...
In this paper we consider the problem of shunting train units on a railway station. Train units arri...
Railway dispatchers reschedule trains in real-time in order to limit the propagation of disturbances...
Trains movements on a railway network are regulated by official timetables. Deviations and delays oc...
Trains movements on a railway network are regulated by official timetables. Deviations and delays oc...
Train movements in railway lines are generally controlled by human dispatchers. As disruptions ofte...
In a railroad system, train pathing is concerned with the assignment of trains to links and tracks, ...
Abstract. We consider the situation of rearranging freight trains in a shunting yard with a hump and...
Due to growing demand of sustainable transport, the number of passengers carried by railways is incr...
A train platforming problem (TPP) involves assigning platforms and routes to trains according to the...
A locomotive assignment is one of the subproblems in railway scheduling domain. In this report prese...
When not in use, trains are stored at shunting yards, where they may need servicing. Planning for wh...
Trains’ movements on a railway network are regulated by official timetables. Deviations and delays o...
With few exceptions, train movements are still controlled by human operators, the dispatchers. They ...
The locomotive scheduling problem (or the locomotive assignment problem) is to assign a consist (a ...
The Train Unit Shunting and Servicing (TUSS) problem is an NP-hard problem encountered by the Dutch ...
In this paper we consider the problem of shunting train units on a railway station. Train units arri...
Railway dispatchers reschedule trains in real-time in order to limit the propagation of disturbances...
Trains movements on a railway network are regulated by official timetables. Deviations and delays oc...
Trains movements on a railway network are regulated by official timetables. Deviations and delays oc...
Train movements in railway lines are generally controlled by human dispatchers. As disruptions ofte...
In a railroad system, train pathing is concerned with the assignment of trains to links and tracks, ...
Abstract. We consider the situation of rearranging freight trains in a shunting yard with a hump and...
Due to growing demand of sustainable transport, the number of passengers carried by railways is incr...
A train platforming problem (TPP) involves assigning platforms and routes to trains according to the...